NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146383
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document OULYYC TYPEWRITTEN PRMS WIS Ef CCEPTEL DÉPASS YAYC DEEAMENT OF ENVIROMMENTAL PROTECTION Asbestos Control Program 9-17 Junction Boulevard, 8* Floor, Corona, NY 11368-510 ISBESTOS PROJECT NOTIFICATION = (ASBESTOS INSPECTION REPORT) TAUI4ьONNOI ding Dept. or TRU R OFFICIAL USE OI Ctl #. 1. 1,200 - fee schedule) When submitting this form at the NYC Department of Buildings, the original form and three (3) coples with original signatures-are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities. I. FACILITY E 2. Address_65 Nassau Street AKA N/A 5. Type of Facility Apartments Borough Manhattan _3. Block 65 6. Name of Builling N/A _Zip 10001 _4. Lot 1 IL. BUILDING OWNER 7. Name_65 Nassau Owners Corp. 8. Contact Person Scott Jaffe 9. Tel.# Fax# 10. Address_65 Nassau Street - City NY State NY _ Zip 11101 IIL GENERAL CONTRACTOR 11. Name N/A .Tel.# IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name_Black Rock Construction Co. 14. Federal Employer ID. # _ 15. Tel.# _13. Contact Person_Tony Brown Fax# 16. Address 88-15 168th Street # 6C _ City Jamaica State_NY _Zip_11432 V. THIRD PARTY AIR MONITOR 17. Name Central Environmental inc. 19. Federal Employer ID. # 20. Tel. _18. Contact Person_Alim Yerima Fax# 21. Address_91 McClellan Street _City_Bronx 22. Sample Analysis Laboratory_ Taylor Environmental State _NY_ Zip_10452 23. NYS DOH ELAP # 11480 VI. PROJECT INFORMATION 24. Starting date for this portion of work _12/5/01 Projected completion date_4/5/02 Asbestos work schedule Monday E Tuesday E] Wednesday Thursday l Friday Saturday • Sunday ¡10, Shift from: 9:00Elam pm to 5:30 Dlam lpm If othe specify 18 Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 46,250 Square Feet, and/or _ 0 Linear Feet 45,750 TB RECEIVED DEC 1 1 2001 EP BAN! -.SBEST TRUG IsITTal TE ACP 7 2/2001 NYC-WTC_000146383

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146383Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →