NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146328
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Ewer rr wrreeseras x Sofa, NY 11368-5107 % ‘ -aOygeT NOTIFICATION FORMS WILL BE “Sau ON REPORT) 1 Lg Z, 2ZO0.00 ACCEPTED {_www.nyc.govldep ) : (Sea lee ile) When submitting this form sick fortn and three (3) copies with original signatures are requifed. Submitial at the NYCDEP requires one copy of the Jorm with original signatures. This form must be submitfed to the NYC DEP not less than one week in advance ofthe start of abatement activities . 3 (. FACILITY on 2. Address 115 Broadway 3rd Floor Borough Manhattan zip 10006 AKA 3. Block 50 4.Lot _1 5. Type of Facility Commercial Office Bldg 6: Name of Building IL. BUILDING OWNER 7. Name Capital Properties 8. Contact Person Kevin Hoey 0 a "oe 10. Address 111 Broadway State NY Zip 10006 {ll. GENERAL CONTRACTOR 11. Name AMG Environmental, LTD Tel. | on Vv. ASBESTOS ABATEMENT CONTRACTOR 12. Name Green Star Enterprises, Inc. 13. Contact Person Kenneth Bowen 14.Fodeat Employer sr Ey 146. Address 23-03 45 Road Suite 402 City LIC State NY zip 11101 V. THIRD PARTY AIR MONITOR 17. Name [he Windsor Consulting Group 18. Contact Person Bernard Fontaine 19. Federal Employer ID. a 20. Tel. a. #£_-=_ mm 21. Address _14 Sheinfine Avenue city South River Stato NJ zn 08882 22. Sample Analysis Laboratory EMSL 23. NYS DOH ELAP # 11469 VI. PROJECT INFORMATION 24. Starting date for this portion of work LOLC ZO Projected completion date_“7/ 237A Asbestos work schedule [©] Monday [J Tuesday wednesday MJ Thursday [I Friday D1 saturday LJ sunday Shift from: 8:00 [Mam O pm to 12:00_ M1 am C1 pm {f other, specify Access to inspect the premises must be provided during the work schedule indicated in this tem. oct 139 2001 25. Total amount of asbestos-containing material to be abated during this work | PROGRAM. ~ . TRUG ___ 8,000 square Feet, and/or O Linear Feet NYC-WTC_000146328

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146328Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →