Standard Operating Procedure Page 8 of 10 Lockout/ Tagout 1/00 Edition
Table I LOCKOUT OR TAGOUT SEQUENCE
NOTIFY EMPLOYEES _____________________ ACTION__________________________ Site Supervisor A. Notifies all personnel affected by the lockout or tagout application and the reason therefore. SHUTDOWN PROCESS OR EQUIPMENT Authorized Employee A. Turns off or returns operating controls to the neutral mode using appropriate equipment/process shutdown procedures. B. Operates switches and/or valves or any other energy isolating device(s) so that the equipment is isolated from its energy source(s). PLACE LOCKOUT AND/OR TAGOUT Authorized employee A. Applies safety locks and tags in all cases as required to isolate all energy devices. The lockout or tagout must be visible and accessible to anyone attempting to operate the isolated device. VERIFY THE ABSENCE OR CONTROL OF ENERGY Authorized employee A. Checks or tests all systems after the lockout and tagging procedures have been completed to insure that total energy isolation has occurred. CAUTION: Return operating control to neutral or off position, after verification of _______________________________ energy isolation.________________________________________________ REMOVE LOCKOUTZTAGOUT DEVICES Authorized Employee A. Checks the area around the machine or equipment to ensure that no one is exposed. B. Removes all tools from machines or equipment. Ensures all guards have been reinstalled and employees are in the clear. C. Ensures that all pipes that were opened for repair or draining purposes are closed and connected properly. D. Ensures that all controls are in off position or neutral position. E. Removes safety locks and/or tags. F. Operates the energy isolating devices to restore energy to the machine or equipment ADMINISTER LOCKOUTZTAGOUT DEVICES Site Supervisor A. Maintains a lockout or tagout log at the lock cabinet. B. Schedules and performs surveillances so that proper lock and tag procedure is being followed. C. Schedules and performs audits of the proper lock and tag procedure.
5.7 PROCEDURE INVOLVING MORE THAN ONE PERSON
Each individual working on equipment or processes shall be required to place his/her own personal lockout device or tagout device on the energy isolating device.
When an energy isolating device cannot accept multiple locks or tags, a multiple lockout or tagout device (hasp) may be used. If a lockout is used, a single lock may be used with the key being placed in a lockout box or cabinet which allows the use of multiple locks to secure it. Each employee will use his/her own lock to secure the box or cabinet.
6.0 REFERENCES
29 CFR 1910.147
WRS Infrastructure & Environment, Inc.
NYC-WTC_000145130
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer