of the following conditions are observed:
i. mixed residential and commercial use within a building;
ii. dust and/or debris in common spaces;
iii. the presence of mold on building components (walls, support beams,
ceiling tiles, HVAC systems)(NYC DOH notification);
iv. the presence of peeling, flaking or chalking paint (NYC DOH
notification);
V. the presence of potential asbestos-type insulation (e.g., fibrous
materials)(NYC DOH notification if damaged);
vi. residents with special needs or medical conditions that may be aggravated
by exposure to airborne contaminants; or
vii. other circumstances that may require deviation from the
procedures specified in the scopes of work for the cleaning
and monitoring contracts.
e. In consultation with EPA, the Project Monitor will make a determination of the
appropriate Cleaning Contract Scope of Work (i.e. Scope A or B) to be
implemented. This determination is to be made based on the descriptions
included in the Cleaning Contract Scope of Work and best professional
judgement.
Deliverables
All deliverables shall be provided in the EPA Indoor Air web database via F2L or an
agreed upon alternative electronic format or website approved by EPA within 24 hours
of activity.
The Project Monitor shall record all pre-cleaning and pre-sampling inspection
information in the EPA Indoor Air database or using an agreed upon electronic format.
This information shall include, but is not limited to, building cleaned or inspected by
DEP (Y/N), type of HVAC system (central, individual or none), HVAC impacted (Y/N),
occupant present (Y/N), written access obtained (Y/N), space occupied (Y/N), dust
present (low/high), presence of mold on building components (Y/N), peeling
/flaking/chalking paint present (Y/N), suspected ACM present (Y/N), residential use
(commercial/residential), residents with special needs, cleaning method (Scope A or B).
Dates and times shall be associated with all activities including start and finish date.
3. In the event that mold or flaking, peeling or chalking paint is observed on building
components (walls, support beams, ceiling tiles, HVAC systems) in areas where work has
been requested, the Monitoring Contractor will notify EPA and fax a written request for
assistance in evaluating potential health hazard to NYC DOH at 212-442-3378. Cleaning
will not proceed in areas where mold or flaking, peeling or chalking paint is observed
until potential hazards are evaluated and addressed as necessary. The Project Monitor
shall be familiar with NYC DOH’s Mold Assessment and Remediation Guidelines.
Deliverables
The Project Monitor shall record if mold or flaking, peeling or chalking paint is present
5