Draft scope of work for World Trade Center dust sampling

Machine-extracted title · confidence 90%

Contractual draft establishing regulatory compliance and roles for site inspections, assessments, and monitoring of dust remediation.

NYC-WTC_000140382

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140382
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Air Residential Assistance Program Monitoring Contract Seo|pe of Work DRAFT - 6/24/02

A. Introduction All work performed under this contract must be in compliance with all applicabl ■evant, and appropriate regulations and this Scope of Work, including but not limit; »ti 'of the United States Environmental Protection Agency (EPA), the United Sates Dei df Labor, Occupational Safety and Health Administration (OSHA), the New Yo Apartment of Labor (NYSDOL), the New York State Department of Health Enviroi .ahuiatory Approval Program (ELAP) and the New York City Dcj lent of Err iron] ital Protection (NYCDEP). This project shall involve site inspections,! 'CVS. and assessment' coordinating and monitoring the clean up of dust dchris sampling from buil irtments impacted by the collapse of the World Trade Center.

S. Roles and Responsibilities The USEPA has overall responsibility for insuritr rt work conS as part of the Indoor Air Residential Assistance Program is completed sale •fliciently and ^mpliance with the Scope of Work. As such, EPA shall have the for o 111? autliorities ring to work conducted under this contract:

1. The authority to stop work for health w safety reasons or for non-compliance with the Scope of Work.

2. The ithority to dinjikti 'contraci Tormance of the work.

3. thorily to rcvici prove dr disapprove of the qualifications of all contractor per! nd involved im

4. The ;nspei id accept or reject any work .

< • Oiiaiiflcations Prool'of qualification^Bust be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

Tl Monitors must possess valid NYS Asbestos Project Monitor certificates. Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to schedule pre cleaning unit inspections with residents.

NYC-WTC_000140382

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140382Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →