NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 05/SCOPES OF WORK IN DOOR AIR & CLEANING
Document / 1 page

Monitor and technician qualification requirements for sampling, Jun 2002

Machine-extracted title · confidence 95%

Lists certification and experience requirements for monitors and technicians conducting asbestos sampling and HVAC evaluations.

NYC-WTC_000140364

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140364
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

The Contractor shall attend meetings or conference calls with EPA and coordinate field activities, as requested.

All appropriate data, original field forms/data sheets, and chain-of-custody forms shall be collected and completed in accordance with the instructions contained in the contract and provided to EPA. All samples and copies of necessary documentation shall be hand delivered to EMSL laboratories at: 307 W. 38* St., New York, New York 212-290-0051. This information may be provided via FormsII Lite (F2L) or an alternative electronic format that is accessible by the laboratory.

Deliverables

All deliverables shall be provided via F2L or an agreed won altemativc el k hinii.i;: aporbved by USEPA and DEP.

The Project Monitor shall also maintain a copy of eacl e and all filed dociunentation submitted under this contract for 365 days. .

The Project Monitor shall direct and coordinate ^report ings to EPA. The scope of this project will be as follows:

5. The Project Monitor shall be resi msible ft ccessiirg a secure EPA Website (url, user name and password to be provided by EPA)EPA) JtOobtain requestor information (address, building identification numbers, etc.). in'coord»Hon with the EPA, the Project Monitor will access residential services requested from the Website and schedule clean-up activities and air sampling with the tenanis/owners, asbesto.s abatement contractors and air monitoring tcchniciims for the various apartments. T he Project Monitor will then supply relevant ^formation on activities for tJie EPA Indoor Air database via the secure EPA website. Data to ■ y include but is not limited to start and completion dates for the cleaning, sampling dal and sample identification numbers.

Delivera!

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure thal^ach deliverable is accurate and complete, technically sound, and free of clerical errors.^

Je Project Monitor shall provide a validated address and scheduling information into the •PA Indoor Air web database via F2L or an agreed upon alternative electronic format or vebsitc approved by EPA within 24 hours of activity.

6. The Project Monitor will schedule and conduct pre-cleaning or pre-sampling building inspections of the residential units, heating, ventilation and air conditioning systems (HVAC)

NYC-WTC_000140364

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140364Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →