Scope of Work: Monitor and technician qualification requirements, Jun 2002

Machine-extracted title · confidence 100%

Lists certification and experience requirements for monitors and technicians conducting asbestos sampling and HVAC evaluations.

NYC-WTC_000140363

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140363
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

C, Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. The Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translatio fes to schedule pre-cleaning unit inspections with residents.

Technicians , Air monitoring technicians must possess valid NYS Asbestos Project Sampling Te< (APST) certificates. Technicians must have performed air sampling for at least 6 months.

ALL analytes and methods should be listed here

Sampling Parameters Methods 1. Asbestos NIO^^Slods 7400 & 7402, 2. Total Metals EPA Method 3. Mercury EP A Method W-8'

P. Specifications Clean-up activities shall be) etiuled for 20 un per day. Air sampling shall be scheduled and completed in these units within 24 hours of succes fl visual inspection by the Project Monitor. Air sampling shall also be provided at 10 to 20 units where clean-up activities are not scheduled. Sufficienl personnel shall be available for project monitoring and sampling.

The contractor shall have available sufficient quantities of sampling equipment to provide the amount and typc of samples required for this project. At a minimum the following equipment is required: air-sampling pumps with maximum flow rate capacities of 15 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.8um.

The Monitoring Contractor shall prepare a Health and Safety Plan (HASP) in accordance with 29 CFR 1910.1001 and 29 CFR 1926.58. All personnel involved in residential cleaning and monitoring activities shall follow the Health and Safety Plan (HASP) prepared by their employer. EPA shall be provided with a copy of the employer HASP prior to the start of work.

The Project Monitor shall attend a kick off meeting prior to commencement of sampling activities. At this time, the Contractor shall, but not be limited to, participate in scope of work discussions, sampling logistics, obtain resources for residential information provided by EPA and DEP, and demonstrate data acquisition procedures and software.

NYC-WTC_000140363

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140363Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →