C, Qualifications
Proof of qualifications must be presented upon request, including qualifications for wipe
sampling, personal monitoring and HVAC evaluations.
Project Monitors
The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. The Project
Monitors must have served as a third party project monitor on at least 20 asbestos abatement
projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos
abatement projects. The Project Monitor must have access to translatio fes to schedule
pre-cleaning unit inspections with residents.
Technicians ,
Air monitoring technicians must possess valid NYS Asbestos Project Sampling Te< (APST)
certificates. Technicians must have performed air sampling for at least 6 months.
ALL analytes and methods should be listed here
Sampling Parameters Methods
1. Asbestos NIO^^Slods 7400 & 7402,
2. Total Metals EPA Method
3. Mercury EP A Method W-8'
P. Specifications
Clean-up activities shall be) etiuled for 20 un per day. Air sampling shall be scheduled and
completed in these units within 24 hours of succes fl visual inspection by the Project Monitor. Air
sampling shall also be provided at 10 to 20 units where clean-up activities are not scheduled.
Sufficienl personnel shall be available for project monitoring and sampling.
The contractor shall have available sufficient quantities of sampling equipment to provide the
amount and typc of samples required for this project. At a minimum the following equipment is
required: air-sampling pumps with maximum flow rate capacities of 15 liters per minute, tripods,
rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.8um.
The Monitoring Contractor shall prepare a Health and Safety Plan (HASP) in accordance with 29
CFR 1910.1001 and 29 CFR 1926.58. All personnel involved in residential cleaning and monitoring
activities shall follow the Health and Safety Plan (HASP) prepared by their employer. EPA shall be
provided with a copy of the employer HASP prior to the start of work.
The Project Monitor shall attend a kick off meeting prior to commencement of sampling activities.
At this time, the Contractor shall, but not be limited to, participate in scope of work discussions,
sampling logistics, obtain resources for residential information provided by EPA and DEP, and
demonstrate data acquisition procedures and software.