NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 43/E-mails M. Gilsenan 2002
Document / 14 pages

E-mails M. Gilsenan 2002

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000164030–000164043
Page image
Scanned page image, NYC-WTC_000164032
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4. The fight to receive, inspect and acceptor reject any work. ■ ' C. Qualifications - ■ Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

Project Monitors ■ ' ■ The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. The Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Trqject Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services lo schedule pre-cleaning unit inspections with/residente

Techniciatts ■ w ■ ri - Air monitoring technicians must possess valid NYS Asbestos f’nyecl Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least () months.

ALL oalytes and nietliods sbnuld be listed here

Sampling Parameters Methods alT/ jgf ''lllllilSIIIIY 1. Asbestos NIOSH Methods 7400 & 7402 2, Total Metals EPA Method SW-846 601 OB 3. Mercury • EPA Method SW-846 7471A

I). Specifications ■ Clean-up activities shall be scheduled for 20 units per day. Air sampling shall be scheduled and completed in these units within 24 hours of successful visual inspection by the Project Monitor. Air sampling shall also be provided at 10 to 20 units where clean-up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

The contractor shal 1 have available sufficient quantities of srimplmg equipment to provide the amount and h pe ofsumplcs required for this project. At a minimum the foilowing equipment is required: air-sampling pumps with maximum flow rate capacities of 15 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of O.Sum.,

The Monitoring Contractor shall prepare a Health and Safety Plan (HAS P) in accordance with 29 CFR 1910.1001 and 29 CFR 1926.58. All personnel im'olved in residential cleaning and monitoring activities shall follow the Health and SafetyRlan (HASP) prepared by their employer. EPA shall be provided with a copy of the employer HASP prior to- the start of work.

The Project Monitor shall attend a kick off meeting prior to commencement of sampling activities. At this time, the Coatector shall, 'butnotbglimitedto,participatemscopedfw(Hk discussions, samplinglogistics,

NYC-WTC_000164032

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164032Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →