NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/E-Mails Hotline M. Gilsenan
Document / 20 pages

Updated WTC cleaning and monitoring scopes of work, July 2002

Machine-extracted title · confidence 74%

Distribution of updated statement of work documents for WTC cleaning and monitoring programs.

NYC-WTC_000138674–000138693

Folder label: “E-Mails Hotline M. Gilsenan

Page image
Scanned page image, NYC-WTC_000138683
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4. The right to receive, inspect and accept or reject any work. C. Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. The Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to schedule pre-cleaning unit inspections with residents.

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

Sampling Parameters Methods 1. Asbestos NIOSH Methods 7400 & 7402 2. Total Metals EPA Method SW-846 6010B 3. Mercury EPA Method SW-846 7471A

D. Specifications Clean-up activities shall be scheduled for 20 units per day. Air sampling shall be scheduled and completed in these units within 24 horns ofsueoKsfiil visiial inspection by the Project Monitor. Air sampling shall also be provided at 10 to 20 units where clean-up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

The contractor shall have available sufficient quantities ofsampling equipment to provide the amount and type ofsamples required for this project. At a minimum the following equipment is required: air-sampling pumps with maximum flow rate capacities of 15 liters per minute, tripods, rotameters, sample cassettes with mixed cellulose ester filters having pore size of 0.8um.

Hie Monitoring Contractor shall prepare a Health and Safety Plan (HASP) in accordance with 29 CFR 1910.1001 and 29 CFR 1926.58. All personnel involved in residential cleaning and monitoring activities shall follow the Health and Safety Plan (HASP) prepared by their employer. EPA shall be provided with a copy of the employer HASP prior to the start of work.

The Project Monitor shall attend a kick offmeeting prior to commencement ofsampling activities. At this time, the Contractor shall, but not limited to, participate in scope ofwork discussions, sampling logistics, obtain resources for residential information provided by EPA and DEP, and demonstrate data acquisition procedures and software.

NYC-WTC_000138683

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000138683Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →