taped to existing surfaces.
g- Common spaces will be sampled without the use of forced air devices (fans, leaf
blowers etc). For small spaces, less than 160 square feet, 3 samples will be collected.
For large spaces greater than 160 square feet and less than 25,000 square feet 5 samples
will be collected. For spaces greater than 25,000 square feet, 1 sample will be
collected for each 5,000 square feet. Sampling equipment shall be placed away from
obstructions. The sampling cassette must be placed on a tripod directed downward at
a 45 degree angle and not taped to existing surfaces. ’
h. Air samples shall be collected in accordance with the procedures specified in NIOSH
Method 7400 for PCM and 7402 for TEM. Air stripling pumps need to be monitor^
to ensure pumps are not clogging by monitoring flow rates, the minimum sampling
volume required is 3600 liters.
I. The contractor shall document all the necessary information regarding sampling
activities, fill out all field logs, data sheets, and chain-rfi'-custody fomis. The contractor
shall use F2L for all sample and chain-of-custody documentation. Samples must be
labeled and accompanied with completed chain of custody forms before shipping to the
designated laboratory. The label must include the EPA Project Tracking Number.
Samples will be packed, sealed and fg|f|^sis to EMSL laboratories at: 307 W. 38*
St., New York, New York 212-290-0051. .
j- All infonnation must be maintained using the secure EPA website(url, user name and
password to be provided by EPA). Dates tor monitoring and/or cleaning shall be
provided to EPA and DEP electronically in an EP.A approved format within 24 hours.
Intbrmation on sampling acti\ itics (dale, sample ID) will be provided to EPA, via the
website, within 24 hours of completion of evaluation.
Deliverable.s
The Project Monitor shall review all deliverables prior to submission to EPA. The review shall
assure that each deliverable i.s accurate and complete, technically sound, and free of clerical
errors. = | .. '\
The Project Monitor shall record all post-cleaning information in the EPA Indoor Air database
or an agreed upon electronic format. This information shall include but, not limited to
sampling technique (aggressive or modified aggressive), visually cleaned (Y/N), damage claim
(Y/N), and post clean-up status (pass/fail). Dates and times shall be associated with all
ri* s,activities includi^ start and finish date.
Additional information shall be recorded include not limited to absence of dust/debris,
-X /'equipment used (leaf blower, fan etc.), size of space, start and completion dates for the
cleaning, sample media, flow media type, flow rates (start/final, flow rate (average), Time
(start/finish), Total elapsed time (min), Calculated sample volume (L), Pump fault, weather,
units, QC samples (lot blank) sampling dates, sample IDs, complete chain of custody, EPA
Project Tracking Numbers and laboratory address shall be entered into an agreed upon
electronic format or website approved by EPA within 24 hours of activity. Dates and times
shall be associated with all activities including start and finish date.
NYC-WTC_000140323