NYC 9/11 Public Portal Document
shutdown on the twelve inch water main.
The water was off at 4:40 a.m. and approximately one hundred residential consumers were affected.
DEP personnel initiated repairs on the failed section of water main and restored water service at
10:45 a.m. Due to considerable roadway damage and undermining, it was necessary to call the
emergency repair contractor for permanent roadway restoration. The site was turned over to the
contractor at 11:00 a.m. and restoration was completed on December 1, 2000.
8 Inch Water Main Break - 163rd Avenue Between 90th and 91st Streets; Queens
On Tuesday, November 28, 2000, at 2:30 a.m., the NYC Fire Department reported a possible water
main break in 163rd Avenue between 90th and 91st Streets. DEP personnel responded, were on
location at 3:00 a.m. and found street flooding with a heavy flow of water emanating from a broken
8 inch water main in 163rd Avenue, west of 91st Street. The Fire Department and the Mayor's
Office of Emergency Management were on location and traffic was safely diverted around the water
main break area. The crew called for assistance and initiated a shutdown on the 8 inch water main.
The water was off at approximately 4:45 a.m. One hundred residential consumers were affected.
Department personnel repaired the water main and water service was restored at 9:30 p.m. The
damaged roadway was repaired and 163rd Avenue was re-opened to traffic.
12 Inch Water Main Break - Intersection of Third Avenue and East 104th Street; Manhattan
On Wednesday, November 29, 2000, at 5:00 a.m., the NYC Fire Department reported a water main
break in the intersection of Third Avenue and East 104th Street. DEP personnel responded, were
on location at 5:30 a.m. and found considerable street flooding. The Fire Department, Police
Department and the Mayor's Office of Emergency Management were on location. The Police
Department diverted traffic off Third Avenue; East 104th Street was closed between Lexington and
Third Avenues. The crew called for assistance and initiated a shutdown on the 12 inch water main.
The water was shut off at 7:35 a.m. and approximately one hundred twenty-five residential
consumers were affected. Third Avenue, with the exception of two lanes on the west side, was
opened to traffic; however, East 104th Street remained closed. DEP personnel initiated repairs on
the failed section of the water main and restored water service at 5:00 p.m. Due to considerable
roadway damage and undermining, it was necessary to call the emergency repair contractor for
permanent roadway restoration. The site was turned over to the contractor and restoration will be
completed today.
12 Inch Water Main Break - Intersection of Broadway and East 14th Street; Manhattan
On Saturday, December 2, 2000, at 5:04 p.m., the Transit Authority notified Central
Communications that there was a leak in East 14th Street which was affecting operation on the south
bound L train, causing service to be suspended. DEP personnel responded, were on location at 5:30
p.m. and determined that a 12 inch water main in the intersection of University Place and East 14th
Street had failed and was flooding the subway tracks; in addition, there was some minor flooding
in the basement of the commercial building on the south side of East 14th Street. There was no
street flooding and roadway traffic was not interrupted. The crew initiated a shutdown on the 12
inch water main. They were able to effect an intersection shutdown. The water was shut off at 7:30
p.m. and no consumers were affected. The Transit Authority was able to restore normal service on
NYC-WTC 000137944
OCR can misread numbers and units. Confirm readings against the page image before using them.