Reference: WTC Rebuilding of New York City Transit 1&.9 Subway Lines
Dear Mr. Soriano:
As part of the above referenced matter Staunton Chow, P.C. Engineers and Architects (SC) have
been tasked by the New York City Transit Authority through FMP Group to investigate the water
leaks in the vicinity of the former World Trade Center site (WTC) as a result of the September 11
terrorist attack. Presently, the New York City transit Authority is rebuilding the 1 and 9 train line
and they have expressed concern about the possible uplift pressures of ground water. Please note
that the NYC TA, currently has data regarding the water table, but need to have information on
the water main and sewer main breaks occurred at the time in order to have an accurate
interpretation of the data. In addition, we need specific information and maps from your office to
complete the information NYCTA needs to rebuild the subway lines.
We are also enclosing the completed NYCDEP forms requested from your office. In addition to
the requested water and sewer main maps, we require the following information of the water main
breaks in the vicinity of the former World Trade Center site in order to accurately proceed with
the rebuilding of the subway lines 1&9:
□ Location of the water and sewer main breaks.
□ When the water main shut down took place.
□ When and what emergency repairs were done to the water and sewer mains.
□ Approximate amount of water (gallons) lost due to water and sewer mains.
Please note that our office, as consultants to the PPM Group and the New York City Transit
Authority, will use this information solely for the purpose of interpreting readily available
groundwater information in the above-mentioned project.
Should you have any questions or concerns, please do not hesitate and contact the undersigned.
Thanks in advance.
/ /
Very truly ^ur^,
STAUNT^' GifOW ENGINEERS, P.C.
In
Project 'f^enaget, Environmental Engineer
■ Cc: Jose K. Cardenas, P.E., Vice President, Staunton Chow Engineers
• Dr. Kevin Phillips, P.E. FPM Group..........
■ Enc. NYC DEPnequest for information ■- • •
i.
.4.
..i ,------- ,, tn idO'VVesf IZ’TScreW •
• . -1.. ‘
Ybii.- N^-Yoffc lOCWt ' -!
I....4 • —J f
NYC-WTC_OOO1521O4
OCR can misread numbers and units. Confirm readings against the page image before using them.