NYC 9/11 Public Portal Document
FED-16-2001 15:3B MRYOR'S OFC of ENV. COORD tQ 1 212 ?BS 2941 P.02/02
ç P
Sumowicz, Alessandra
From: Sturcken, Charles [CHARLESS@DEPI LAN.CI.NYC.NY.US]
Sent: Friday, February 18, 2001 3:17 PM
To: [email protected]
Subject: RE: Issues - Please address ASAP
te r -
1) we made contact with Sherilyn James. She informs us that she accepted 7
v
a position with HRA.
2) The Groton S ' the consulting engineering firm has done
their anatysisan has said that based upon their data the bridge should
remain closed. On Monday, the engineering firm, the contractor and DEP
will meet to discuss repair options; that entails modifying the original
repair contract proposed and moving ahead with the reconstruction of the I /"ja Z u
bridge which will mean a longer shutdown; or making immediate repairs to tr _ y'Vft'—
fix the problem of the bridge support shifts and opening up the roadway in I 1 .
@ two weeks , deferring til later the longer term fix in a staggerred /1 ~ y—Q
closure scenario. A better time frame will be decided on Monday. 1 ~~
3)1 have put in a call to the Chief of Staffs office on the third item.
From: ASUMOWICZ
To: CHARLESS; "Sturcken, Charles" <[email protected]>
Subject: Issues - Please address ASAP
Date: Friday, February 16, 2001 9:44AM
Received: from MAYOREXS02.NYCNET by SSWCDCSA.CI.NYC.NY.US
(SofCSwitch Central 4.4.4.2);
16 Feb 2001 0944:53 EST
Received: by mayorexs02.nycnet with Internet Mail Service (5.5.2650.21)
id <1525S6CJ>; Fri, 16 Feb 2001 09:46:29 -0500
Message-ID: <[email protected]>
From: "Sumowicz, Alessandra" <asumowicz©cityhall.nyc.gov>
To: "Sturcken, Charles" <[email protected]_us>
Subject: Issues - Please address ASAP
Date: Fri, 18 Feb 2001 09:46:25.0500
Return-Receipt-To: "Sumowicz, Alessandra" <[email protected]>
MIME-Version: 1.0
X-Mailer: Internet Mali Service (5.5,2650.21)
Content-Type: textfpla!n;
charset="Iso-6859-1"
1) Where are we with Cheralyn James?
2) You mentioned that you were expecting some analysis back on the
Croton Bridge today. Joe wants a short memo on some general perimeters
- what does the analysis show, what are the next steps, what is a
general time-frame? I understand that you cannot give a definite date
as to when the bridge will be up and running, but some generic ideas are
needed. Please put something together for today.
3) FYI - You may want to re-think holding up Ed Careya paperwork, as
that direction did come from Vinny - food for thought!
TOTAL P.02
NYC-WTC 000137809
OCR can misread numbers and units. Confirm readings against the page image before using them.