Asbestos inspection log for roof cleanup, 111 Fulton Street, Jul

Machine-extracted title · confidence 94%

Inspection log recording decontamination unit construction and roof cleanup activities at 111 Fulton Street from July 14 to 16, 2002.

NYC-WTC_000128760–000128761

Folder label: “111 FULTON STREET 1001263, 91/1

Page image
Scanned page image, NYC-WTC_000128760
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • • • Asbestos Inspection Report Premise No. III FULTON STREET (AKA ISI WIWLAMST , 60 ANN STREET) Floor ROOF Zip 10038 Borough Block 1 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address Azisg ralpn Avenue, Brookiym NY Phone 11236 (718)531-2900 Laboratory Name Lot Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Warren & Panzer Engineers Inc. Address 228 East 45 Street City Address New York State NY Zip Phone State Zip 10017 (212) 922-0077 Contact Person Inspection Date: AS NOTED Squad # Badge# N/A A020 Photos Taken Yes/ No City Phone Time of Inspection from: AS NOTED SUNDAY JULY 14 2002 8:00AM CONSTRUCTION OF THE REMOTE DECON UNIT BEGINS. PLASTIC SHEETING IS INSTALLED OVER DRAINS ON THE ROOF. 9:20 AM CLEAN UP ACTIVITIES BEGIN ON THE THREE SMALL ROOF AREAS ABOVE THE MAIN ROOF IN ACCORDANCE WITH THE APPROVED WORK PROCEDURES 6:30PM WORKERS HAVE COMPLETED BAG-OUT ACTIVITES AND LEAVE THE WORKSITE• MONDAU JU18 15 2002 2:00PM WORKEDS ARE WASHING AND FILTERING STONES ON THE POOF AS PER THE APPROVED SCOPE OF WORK. AIR SAMPUNG IS BEING CONDUCTED BY LUIS SOTO OF WARREN & PANZEE 8:00PM WORKERS HAVE COMPUETED BAG-OUT ACTIUITES AND VEAVE THE WORKSITE. TUESDAG SULE 16 2002 8:00AM CLEAN UT ACTIVITIES RESUME ON THE MAIN ROOF. BEGININGI TODAR. TWD WORK CREWS WILL BE USED FOR THIS RODF CUEAN-UP. AIR SAMPUNG IS BENG PERPORMED BY FESTY OSEMWEGIE OF WARCEN $ PANZER. 10:30AM TWO WARKERS ARE ASKED TO WERR THEIE RESPIEATORS. THEY COMPLY IMMEDIATELY. WORK PROGRESSES AS PER THE APPRENED LOORU PROCEDURES. WEDNESDAY JULY 11 TO SUNDAY JUL 21 2002 8:00AM - 8:00PM WCRK PROGUESSES AS PER THE APPROVED WORK PROCEDURES. Pl. NYC-WTC_000128760

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128760Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →