NYC 9/11 Public Portal Document
•
:
•
Asbestos Inspection Report
Premise No.
Zip
118 FULTON STREET
Borough
Block
78
Building Type
Inspection Date:
06-14-02406-17-02
Squad #
N/A
Badge #
FACADE
Inspector
Dennis Antzoulatos
Contractor's Name
Benjamin Kurzban & Son Control
Address
City
1248 Ralph Avenue, Brooklyn
Phone
11236 (718)531-2900
Laboratory Name
Warren & Panzer Engineers Inc.
Address
228 East 45 Street
New York
Lot
46
Basis of Inspection
WTC Survey
Sample Number
N/A
Sample Number
N/A
Sample Number
N/A
Owner's Name
A020
Photos Taken
CxesTNO
Address
City
State
Zip
Phone
(212) 922-0077
Contact Person
Time of Inspection from:
Gam- 6°pM
FRIDAY
9100AM
JUNE 14 2002
WORKERS ARRWE ONSITE AND BEGIN LOADING OF MATERIALS
10:00AM
MANAGING AGEUT ARRIVES ONSITE AND SHOLOS THE CLEAN-UP
CONTRACTOR'S ELECTRICIAN WHERE TO TAP INTO THE BUILDING'S
ELECTRICAL PANEL.
11:00 AM
AIR SAMPLING (MONITORING) EQUIPMENT IS SET UP BU WARREN |
PANZERIS REPRESENTATIVE, LUIS SOTO, FOR THE PURPOSES
OF AIR SAMPLING, THE ROOF LOORK AREAS OF 1I8 FULTON!
120 FULTON STREET WIL BE CONSIDERED AS OVE WORK AREA.
12:30PM
ACLP ENFORCEMENT DIRECTOR C. LUTCHMEDIAL ARRIVES ONSITE
WITH DEP COUNSEL R. PECUNIES TO CHECK ON THE PROJECT'S:
PROGRESS.
4:00PM
6:30PM
THE MALN ROOF WORK AREAS OF BOTH BUILDINGS MAVE BEEN COMPLETED.
WORKERS ARE CLEANING THE SET-BACK ROOFS OF BOTH BUILDINGS
(118 FOLTON STREET AND 120 FULTON STREET).
WORKERS
COMPLETE THE RODE CUEAN-UPS, VISUIAL INSPECTION WIL BE
CONDUCTED WHEN THE WORK AREAS ARE PRU.
MONDAY
JUNE
17 2002
CONDUCTED A VISUAL INSPECTION OF THE ROOF AND SET BACK ROOF
WORK AREAS
•FOUND THEM TO BE FREE OF CUTC DEBRIS.
NYC-WTC_000128895
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000128895Source: NYC Law Department, mirrored locally