NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 47/50 ANN ST. / 119 Fulton Street BIN #: 1001264
Document / 13 pages

Invoice for asbestos abatement, 119 Fulton Street, July 2002

Machine-extracted title · confidence 95%

Invoice from Kurzban & Son Control Inc. for roof work completed at 119 Fulton Street.

NYC-WTC_000119587–000119599

Folder label: “50 ANN ST. / 119 Fulton Street BIN #: 1001264

Page image
Scanned page image, NYC-WTC_000119593
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 119 FULTON STREET Floor 2OOF AND Zip Borough FACADE Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip NY Phone 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 91 Inspection Date: Lot Squad # 8 Basis of Inspection N/A WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name AS NOTED Badge # A020 Photos Taken Ves No Address City State Zip Phone Time of Inspection from: As NOTED MONDAY - JUNE 17, 2002 8:00AM WORKERS BEGIN ERECTING THE REMOTE DECON UNIT ON THE ROOF OF 119 FULTON STREET. THE DECON WIL BE USED FOR THE CUEAN-UP PROSECTS ON THE ROOF OE 119 PULTON, 121 FULTON AND 123 FULTON FOR THE PURPOSES OF AIR MONITORING (SAMPUNG) THE ROOF AREAS OF THESE THREE BUILDINGS WILL BE TREATED AS ONE WORK AREA. THE AlR SAMPUNG WIL BE CONDUCTED BY FAYED EL GENDI CCERMFICATE # AM 01-11631 EXP 03/03) OF WARREN $ PANZEE ENGINEERS, FIVE AIR SAMPLES WILL BE TAKEN. TUESDAY JUNE 18,2002 CIEDSAS POCEMEN AP FNED ELGE OE OFUAANN PANZER ENGINEERS. WEDNES DAY 8:00 AM JUNE 19 2002 WORKERS BEGIN THE CLEAN-UP OF THE NORTH FACADE (ANN STREET) THE ROOF PORTION OF THE CLEAN UP MAS BEEN COMPLETED. NO VISIBLE WTC DEBRIS WAS OBSERVED. THURSDAY 8:00 AM 4: 00 PMI JUNE 20 2002 WORKERS BEGIN THE CUEANUP OF THE SOUIM FACADE (FULTON STREET) THE SOUTH FACADE CLEAN UP UAS BEEN COMPLETED. I CONDUCT A VISUAL INSPECTION OF NORM AND SOUTH FACADE SURFACE FROM THE INTERIOR OF TUE BUILOING (MOOR-BY-FLOOR ) AND FINO NO VISIBLE CTC DEBRIS. THE CUEAN UP ACTIVITIES FOR THIS PROSECT ARE NOW COMPLETE. NYC-WTC_000119593

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000119593Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →