NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No.
III FULTON STREET (AKA ISI WHLAMST 60 ANNST)
Inspector
Dennis Antzoulatos
Inspection Date:
As NOTED
Page 2 of 2
MONDAY JUW 22, 2002
2:00PM
WORRERS HAVE COMPLETED THE MAIN DODE AREA AND AWAIT A VISUAL
INSPECTON OF THE CLEANED SURFACES.
2:00PM- 2:30PM I CONDUCT A VISUAL INSPECTION OF THE LARGE POOF AREA AND
OBSERUE DEBRIS STILL VISIBLE ON LOUVERED OPENINGS AROUNO
AND ALONG THE COPPER FLASHING ONE THE ROOF.
I REQUEST A PECIEANING OF THESE AREAS.
AIR MONITORINE IS
CONDUCIED 1Y FESTE OSEMWEGIE OF WARREN I PANZER.
TUESDAY JULY 23, 2002
8:00AM TO 8:00PM
WORK PROCEEDS AS PER THE APPROVED SODPE 0F WORK.
WEDNESDAS
10:00m
J0W 24,2002
PARAPET AREA BELOW THE COPPER FLASHING REEDUIRES ANOTHER CLEANING
VISIBLE WTC DEBRIS STU REMAINS. AFTER THE RECIEANING WORKERS
WIL BEGIN PLACING THE STONES, CURRENTUL IN PILES, BACK ON THE
R0OF.
THURSPAL JUUt 25 2002
8:00AM - 8:00PM
WORKERS HALE COMPLETED PLSCINE THE SIONER BACK ON THEE ROOF.
NO VISIBLE WTC DEBEIS WAS OBSERIED. THE CLEAN UP FOR THIS
PREMISE HAS NO BEEN COMPLETED.
NYC-WTC_000128761
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000128761Source: NYC Law Department, mirrored locally