← Document results/DEP Box 52/BINDER - PHASE 1 DECONTAMINATION PLAN
Document / 40 pages

Health and Safety Plan, June 2005

Machine-extracted title · confidence 100%

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

NYC-WTC_000127738–000127777

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127775
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

. OSHA Occupational Safety and Health Administration PEL Permissible Exposure Limits PM Project Manager ppm parts per million psia pounds per square inch, absolute psig pounds per square inch, gauge Q&P Quality and Protection SAR supplied air respirator SCBA self-contained breathing apparatus SOW Scope of Work SSHO Site Safety and Health Officer STEL Short-Term Exposure Limit SZ Support Zone TWA Time-Weighted Average WTC World Trade Center

The Copper Group —133-135 Greenwich Street & 21-23 Thames Street Airtek Project 05-0710 - Phase I HASP 6-8-05 Page 38 of 40

NYC-WTC 000127775

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127775Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →