EPA review letter, 133-135 Greenwich Street

Machine-extracted title · confidence 90%

US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134294
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part III — Health & Safety Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 — Rev 3, August 29, 2005

Table 2-2 10 X OSHA PEL 100 X OSHA Action Level (Protection PEL (Protection Contaminants OSHA PEL (Half value of factor for Half- Factor for Fall- OSHA PEL) face APR) face PAPR) Asbestos 0.1 f+cc 0.05 f cc If/cc 10 floc Antimony 0.5 m `ni 0.25 /i 5 m ,m 50 fm Barium 0.5 mg/in' 0.25 /i 5 m /rn 50 /m Beryllium 0.002 mg/m' 0.001 lm 0.02 mn r m 0.2 mg/in' Cadmium 0.005 mg/in' 0.0025 ,`r? 0.05 Mg.,m' 0.5 mg/in' Chmtnium 11I 0.5 mg/m' 025 : 5 mg/in' 50 ,rmm Cop r I mg/m' 05 mg/m' 10 /m 100 mg/ra Lead 0.05 mg/m' 0.025 /in 0.5 to in 5 mg/in' Manganese 5 /m 2.5 m /rn 50mg/in' 500 .hti Meiwry 0.1 mg/in' 0.05 m I mg/m' 10 /m Nickel I mg/in' 0.5 mg/in' 10 Pm 100 .hn Zinc 5 /m 2.5 mg/m' 50 rm 500 /in

2.8 SITE CONTROL

Site control measures shall be implemented to protect the public and personnel working on-site. The aspects of site control shall address general access to the site; and access to the building and site during the deconstruction phase.

Fences, guardrails and access devices, including ladders, stairways, and walking surfaces shall be provided and maintained throughout the project activities in accordance with 29 CFR 1926. In addition, barricades, warning signs, temporary lighting and other safety measures shall be provided, as required, to protect site personnel.

All visitors to the site shall report first to the Contractor field office. Visitor access shall be limited to the Support Zone and Level D operation areas only, and shall be allowed only with the prior consent of the Contractor NYCSSM and the Contractor Site Manager.

No visitor (other than regulatory inspectors) shall enter a work area unescorted by a Subcontractor or Contractor representative. The presence of any regulatory agency on-site shall be reported immediately to the Contractor Site Manager.

2.8.1 Work Zones

Entry into the work zones begins once a person comes on-site. This approach reflects the dynamic nature of the operations and the need for everyone to be aware of the conditions while on-site. Using the concept of three zones for the site, the following areas are identified:

• Support Zone — This area starts at the project/property fence line and extends to the entry to where personnel enter the building to complete the work tasks. This area includes the ground outside of the building and any office spaces. In this area all personnel shall wear Level D PPE. Within this area exclusion zones may be established depending on the operations, for example:

27

NYC-WTC 000134294

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134294Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →