Health and Safety Plan, June 2005

Machine-extracted title · confidence 100%

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

NYC-WTC_000127738–000127777

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127749
OCR text

OCR status: ok · source: pdftotext

NYC 9111 Public Portal Document

• dust and debris; cleaning and salvage of certain installed non-porous building equipment and components contaminated by WTC dust and debris; removal of ACBM primarily within the Building interior; and cleaning of the exterior surfaces of the buildings.

The Copper Group -133-135 Greenwich Street & 21-23 Thames Street Airtek Project 05=0710 - Phase I HASP 6-8-0S Page 12 of 40

NYC-WTC 000127749

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127749Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →