Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
The Owner has retained Airtek Environmental Corp, to conduct Environmental
Investigations of the buildings for additional unidentified asbestos containing building
materials (ACBM). These environmental reports are included in the HASP.
The requirements outlined within this QAPP are based upon the data collected to date. -
S/TEDESCR/PT/ON
The Property is currently developed for a combination of commercial and multi-family
residential use. The Property includes a vacant two-story commercial building that was
constructed on the northwestern portion of the Property circa 1980. The building was
most recently occupied by a pizza shop, a coffee shop, a Japanese restaurant, an Indian
restaurant, a shoe repair shop, and second floor professional (doctors’) offices. The
Property also includes a vacant five-story building that was constructed on the
southeastern portion of the Property prior to 1894. This building includes two ground
floor tenant spaces most recently occupied by a sandwich shop, a Western Union office,
and approximately eight residential units.
The Property is located within the urban commercial downtown Financial District of
Manhattan, New York City, immediately south of the former World Trade Center site
and adjacent to the vacant Deutsche Bank Building. The Property is bounded to the west
by Greenwich Street, to the north by a four story mixed-use (commcrcial/rcsidcntial)
building, to the east by Finance and Economics High School, and to the south by Thames
Street.
Cleaning and Deconstruction Work
In September, 2005 the The Greenwich Street Project, LLC released documents for the
Deconstruction of 133-135 Greenwich Street and 21-23 Thames Street buildings.
Deconstruction will include Asbestos and COPC Abatement and Removal and Structural
Deconstruction. The Asbestos and COPC abatement and removal phase includes the
cleaning and removal of all interior surfaces and non-structural elements within the
building under containment. The clean-up and abatement will be conducted so that the
buildings can be safely deconstructed to allow for redevelopment of the Site. The
Asbestos and COPC Abatement and Removal Phase deconstruction will occur while the
work area is placed under negative pressure containment and includes the following
general categories: (a) the general area cleanup of WTC dust and debris, (b) removal and
disposal of installed porous and certain non-porous building materials and components,
(c) cleaning and salvage of certain installed non-porous building equipment
and components, (d) removal of building materials containing asbestos which were
present in the Building prior to September 11th, 2001 (referred to herein as “ACBM”),
primarily within the Building interior, (e) packaging of asbestos and other regulated
waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury-
containing thermostats, etc. at generation points, movement of containers to the
decontamination unit and movement of decontaminated containers to waste loading, and
18