In keeping with our promise to provide you with written updates on where we are with
ongoing building projects and concerns, we provide the following:
1. As we have previously indicated in our last update additional testing was performed
in the common areas for metal, lead, dioxins, PCB's, voc's, chromium, fiberglass and
asbestos. We have been as frustrated as you that the results have taken so long to
receive. However, we are extremely pleased to report that no lead, asbestos or
fiberglass was found in the air samples! The remaining test results, minus results
for dioxin, are now in and a summary from ATC of all findings of testing done to date
is attached. Dioxin results are held up due to the heavy testing by regulatory agencies
for dioxins that are currently being done which are taking priority over other
laboratory samples. However, all test results for other materials noted above are
well below acceptable industry standards.
2. In addition, we continued to take random test samplings of apartments (149 to date)
for asbestos in addition to 9 apartments, who requested testing, for metals. So far, of
the 209 samples collected (149 apartments — with the balance being in common areas)
test results indicate a single asbestos structure was detectable in only two
samples. The remaining 207 samples reflected no asbestos fibers. Air testing
will continue for those apartments who request it and we will continue to provide the
results as timely as possible.
3. RMC staff is continuing to install the new incremental filters previously described in
our other updates and, as we schedule installation, we continue to remove all
apartment HVAC units and, using wet methods, clean behind the sleeves and
backside of the units. We have installed 100% of the custom filters that we have
received from the supplier and hope the balance will be received and installed within
the next 2 weeks. If you have any particular concerns, and want your filters changed
prior to your floor being scheduled for installations, please feel free to contact our
concierge desk and have a service request put through for this.
4. As previously announced in our last update, our environmental consultants identified
a qualified indoor air quality and mechanical hygiene contractor to perform the
cleaning of the air ducts and vent lines in the building. On Thursday, December 6th,
the contractor began this work. On Monday, December 10th, while supervising the
contractors, our ATC consultant noticed that some of the plastic covers that were
taped over the hallway grilles had come loose and needed to be re-attached.
Immediately, the contractors reattached those covers, and have since added an
additional layer of plastic inside each hallway duct opening of the building to ensure