Asbestos and lead survey report cover, 130 Cedar Street, July

Machine-extracted title · confidence 100%

Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.

NYC-WTC_000125204–000125524

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125208
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos and Lead Paint Inspection Report for 130 Cedar Street, New York, NY 10006

1.2 INTRODUCTION:

Client: Masterworks Development Corp. 56 West 45th Street, 4s' Floor New York, NY 10036

Project Site: 130 Cedar Street New York, NY 10006

Scope of Work: Asbestos and Lead Based Paint Inspection

Dates of Asbestos Inspection: 03/23/04, 5/25/04, 5/26/04, 5/27/04, 5/28/04, 6/3/04, 07/06/2004

Dates of Lead Paint Inspection: 03/23/04, 05/25/04, 05/26/04, 05/27/04, 05/28/04, 06/01/04,

The asbestos survey was performed by certified inspectors Mr. Mohammed Khan and Mr. Pasquel Davis. The lead paint survey was performed by certified risk assessors Mr. Peter Koslowsky and Mr. Shawn Rajkumar.

All work was performed under the direct supervision of NYC DEP Asbestos Investigator, NYS DOL Asbestos Inspector, NYS DOL Project Designer and USEPA/NY State Lead • Inspector Peter Ludwig. The scope of the inspection consisted of determining and the locations, quantity and condition of the suspect materials present at the time of the inspection.

1.3 QUALITY CONTROL PROCEDURES:

JLC has integrated resources, technologies, and discipline to conduct the inspection and analysis based on the following principles:

i. All applicable regulations are addressed in order to assure that our field inspectors and lab personnel meet their responsibilities, do so cost-effectively, and are equipped with the practical knowledge they need in order to understand and comply with regulations that affect them. H. Care Is taken to make certain that the information provided and actions recommended are practical and cost effective in achieving regulatory compliance.

The 'management' approach utilized assured that for this project all work performed received the highest quality service. All project results, reports and recommendations are reviewed for accuracy, content and quality prior to presentation. We recognize that the Information in each assignment we undertake, that the information we develop, and the conclusions and advice we provide will be used to support Important management decisions.

Prepared for Masterworks Development Corp. By JLC Environmental Consultants, Inc. Project No. 04-3271 Page 3

NYC-WTC 000125208

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125208Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →