NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125192
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Carpentry

a. S-Dry: Maximum nineteen (19) percent moisture content as per ASTM D2016.

1.05 SUBMITTALS

A. Pressure Treatment: Include certification by treating plant stating chemicals and process used, net amount of salt retained and conformance with applicable standards.

B. Fire Retardant Treatment Include certification by treating plant that treatment material complies with government ordinances and that treatment will not bleed through finished surfaces.

1.06 PRODUCT HANDLING

A. All items specified In Section 08700 of this specification entitled "Finish Hardware" shall be received, accounted for, stored and applied under this Section.

B. Hardware shall be sorted and stored in space assigned by Contractor and shall be kept at all times under lock and key. The safety and preservation of all items delivered will be the responsibility of the Contractor.

C. Deliver carpentry materials to the site ready to use with each piece of lumber clearly marked as to grade, type and mill, and place In area protected from the elements.

D. Deliver rough hardware In sealed kegs and/or other containers which shall bear labels as to which what type and kind.

E. Pile lumber for rough usage, when delivered to the site in stacks to insure drainage and with a minimum clearance of six (6) inches above grade. Cover stacks with tarpaulins or other watertight coverings. Store grounds and similar small sized lumber Inside the building as soon as possible after delivery.

F. Do not store seasoned lumber in wet or damp portions of the building.

G. Protect fire retardant treated'materials against high humidity and moisture during storage and erection.

H. Remove delivered materials which do not confirm to specified grading rule or are otherwise not suitable for installation from the job site and replace with acceptable materials.

1.07 JOB CONDITIONS

A. Installer must examine the substrates and supporting structure and the conditions under which the carpentry work is to be installed, and notify the Contractor in writing of conditions detrimental to the work. Do not proceed with the Installation until unsatisfactory conditions have been corrected in a manner acceptable to the Installer and the Architect.

B. Coordination: Fit carpentry work to other work; scribe and cope as required for accurate fit. Correlate location of furring, milers, blocking, grounds and similar supports to allow proper attachment of other work.

NYC-WTC 000125192

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125192Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →