Selective Demolition and Façade Restoration Koenen Associates
A. Manufactured articles, materials and equipment shall be applied, installed, connected,
erected, used, cleaned, and conditioned as directed by the respective manufacturers,
unless otherwise specified.
1.07 IDENTIFYING MARKINGS
A. Name plates and other Identifying markings shall not be affixed on exposed surfaces of
manufactured items Installed In finished spaces.
1.08 SUBSTITUTION AFTER AWARD OF CONTRACT
A. The Architect will consider a formal request for the substitution of products in place of
those specified, under the following conditions:
1. The request is accompanied by complete data on the proposed substitution
substantiating compliance with the Contract Documents including product
identification and description, performance and test date, references and
samples where applicable, and an itemized comparison of the proposed with the
products specified or named by Addenda, with data relating to Contract time
schedule, design and artistic effect where applicable, and its relationship to
separate contracts.
2. The request Is accompanied by accurate cost data on the proposed substitution
In comparison with the product specified, whether or not modification of the
Contract Sum is to be a consideration.
B. Requests for substitution based on Paragraph (1) above, when forwarded by the
Contractor to the Architect for review are understood to mean that the Contractor
1. Represents that he has personally investigated the proposed substitute product
and determined that it is equal or superior in all respects to that specified:
2. Will provide the same guarantee for the substitution that he would for that
specified.
3. Certifies that the cost data presented is complete and Includes all related costs
under this Contract, but excludes costs under separate contracts and the
Architect's redesign costs, and that he waives all claims for additional costs
related to the substitution which subsequently become apparent; and
4. Will coordinate the installation of the accepted substitute, making such changes
as may be required for the Work to be complete in all respects, at no additional
cost to the Owner and at no extension of the contract completion date.
C. Substitutions will not be considered if:
1. They are indicated or implied on shop drawings submissions without the formal
request required in Paragraph (1) above; or
2. For their implementation they require a substantial revision of the Contract
Documents in order to accommodate their use.
3. The Architect will examine, with reasonable promptness, such substitution
submittals, and return of submittals to the Contractor shall not relieve the
Contractor from responsibility for deviations and alternatives from the contract
plans and specifications, nor shall It relieve him from responsibility for errors in
Materials and Equipment 1600-2
NYC-WTC 000125142
OCR can misread numbers and units. Confirm readings against the page image before using them.