NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
26 shared non-person entities · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
NYC-WTC_000098612–000098643Folder label: “32 PARK PLACE Block: 126 Lot: 2 Soe 7 BIN: 1001410 110 Church Street, 50 Murray Street”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Li 15. SUBSTITUTIONS OF MATERIALS:
Bidders wishing to obtain approval on items other than those specified by name, shall submit their request, including all material and items required by the Consultant with descriptions, to the Consultant not less than ten (10) days before the bid opening, provided that such request is in accordance with the terms and conditions of the Contract I Document.
Approval by the Consultant will be in the form of an addendum to the specifications issued to all prospective bidders indicating that the additional brand or brands are approved as equal to those specified so far as the requirements of the project are concerned. If the bidders do not elect to obtain prior approval during the time specified, they have thereby evidenced their intention to provide all those articles and brand names stated in the specifications.
16. WORK REQUIRED DURING NIGHTS, WEEKENDS AND HOLIDAYS:
The Contractor shall schedule his work in a manner that assures completion of the project within the time frame specified. If necessary to achieve 100% completion of the project by the agreed upon construction completion date, the Contractor shall work during nights, I weekends and holidays.
17. PROTECTION:
During the life of this contract, the Contractor shall provide adequate protection for the site and building, and the public, wherever work under this contract is required. If, as determined by the Owner, material, equipment, supplies, and work performed are not adequately protected by the Contractor, such property may be protected by the Owner and the cost thereof may be charged to the Contractor or deducted from any payments due him.
1 18. JOB CONFERENCES:
Meetings of the Contractor(s) and representatives of the various trades, and separate I Subcontractors, will be held at the site as directed by the Consultant, for the purpose of furthering the progress of the work. The Contractor and the appropriate Subcontractors shall either be present or be represented at such meetings; it shall be understood and agreed that the Owner and the Consultant, in dealing with Contractor's representatives, do so with full assurance that such representatives' actions and commitments may be accepted the same as though the Contractor were present himself and personally made such agreements or commitments. The Consultant will advise all concerned of the schedule of all conferences.
1 19. RELEASE OF LIENS:
The Contractor shall provide a Release of Liens prior to final payment in a form satisfactory to the Owner.
SC-4
NYC-WTC 000098626
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
26 shared non-person entities · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000110870
Letter submitting executed license agreements for asbestos cleaning at a Lower Manhattan building to DEP.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118585
Final notice letter regarding WTC debris on exterior surfaces of 45 Broad Street dated September 3, 2002.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113034
Permit application documenting DEP exterior building survey findings and requested cleanup of World Trade Center debris accumulations.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127520
Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris from exterior surfaces.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100265
Department of Environmental Protection letter to building owner regarding exterior building surveys conducted in vicinity of World Trade Center and observed debris accumulation.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118972
Facility inspection form documenting ACM and air monitoring status for a building at 65 Beaver Street.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Memo summarizing daily activities including Church Street paving for a memorial service on October 23, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000148742
Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
Cited alongside this record in an Ask answer