130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates
SECTION 01600
MATERIALS AND EQUIPMENT
PART 1.00 -GENERAL
1.01 GENERAL REQUIREMENTS
A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents.
1.02 WORK INCLUDED
A. Work of this Section includes all labor, materials, equipment and services necessary to complete materials, and equipment requirements as specified herein, Including but not limited to, the following:
1. Transportation and handling. 2. Storage and protection. 3. Installation requirements 4. Identifying markings. 5. Substitution requirements. 6. Temporary use of equipment. 7. General standards.
1.03 RELATED WORK
A. General Conditions.
1.04 TRANSPORTATION AND HANDLING
A. Materials, products, and equipment shall be properly containerized, packaged, boxed, and protected to prevent damage during transportation and handling.
B. More detailed requirements for transportation and handling are specified under the technical Sections.
1.05 STORAGE AND PROTECTION
A. Provide suitable temporary weather-tight storage facilities as may be required for materials that will be damaged by storage in the open. B. Available storage space at the job site is limited to the area permitted by the Architect. Allocate such space for storage purposes. Any additional off-site space required Is the responsibility of the Contractor.
C. Allocate the available storage areas and coordinate their use by the trades on the job. Maintain a current layout of all storage facilities.
D. Store and protect materials delivered at the site from damage. Do not use damaged material on the work.
1.06 INSTALLATION REQUIREMENTS
•
Materials and Equipment
NYC-WTC 000125141
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer