NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125141
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates

SECTION 01600

MATERIALS AND EQUIPMENT

PART 1.00 -GENERAL

1.01 GENERAL REQUIREMENTS

A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents.

1.02 WORK INCLUDED

A. Work of this Section includes all labor, materials, equipment and services necessary to complete materials, and equipment requirements as specified herein, Including but not limited to, the following:

1. Transportation and handling. 2. Storage and protection. 3. Installation requirements 4. Identifying markings. 5. Substitution requirements. 6. Temporary use of equipment. 7. General standards.

1.03 RELATED WORK

A. General Conditions.

1.04 TRANSPORTATION AND HANDLING

A. Materials, products, and equipment shall be properly containerized, packaged, boxed, and protected to prevent damage during transportation and handling.

B. More detailed requirements for transportation and handling are specified under the technical Sections.

1.05 STORAGE AND PROTECTION

A. Provide suitable temporary weather-tight storage facilities as may be required for materials that will be damaged by storage in the open. B. Available storage space at the job site is limited to the area permitted by the Architect. Allocate such space for storage purposes. Any additional off-site space required Is the responsibility of the Contractor.

C. Allocate the available storage areas and coordinate their use by the trades on the job. Maintain a current layout of all storage facilities.

D. Store and protect materials delivered at the site from damage. Do not use damaged material on the work.

1.06 INSTALLATION REQUIREMENTS

Materials and Equipment

NYC-WTC 000125141

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125141Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →