SECTION 01600
MATERIALS AND EQUIPMENT
PART 1.00 -GENERAL
1.01 GENERAL REQUIREMENTS
A. Work of this Section, as shown or specified, shall be in accordance with the requirements
of the Contract Documents.
1.02 WORK INCLUDED
A. Work of this Section includes all labor, materials, equipment and services necessary to
complete materials, and equipment requirements as specified herein, Including but not
limited to, the following:
1. Transportation and handling.
2. Storage and protection.
3. Installation requirements
4. Identifying markings.
5. Substitution requirements.
6. Temporary use of equipment.
7. General standards.
1.03 RELATED WORK
A. General Conditions.
1.04 TRANSPORTATION AND HANDLING
A. Materials, products, and equipment shall be properly containerized, packaged, boxed,
and protected to prevent damage during transportation and handling.
B. More detailed requirements for transportation and handling are specified under the
technical Sections.
1.05 STORAGE AND PROTECTION
A. Provide suitable temporary weather-tight storage facilities as may be required for
materials that will be damaged by storage in the open.
B. Available storage space at the job site is limited to the area permitted by the Architect.
Allocate such space for storage purposes. Any additional off-site space required Is the
responsibility of the Contractor.
C. Allocate the available storage areas and coordinate their use by the trades on the job.
Maintain a current layout of all storage facilities.
D. Store and protect materials delivered at the site from damage. Do not use damaged
material on the work.
1.06 INSTALLATION REQUIREMENTS
•
Materials and Equipment