Asbestos permit application correspondence, 130 Cedar Street, Feb 2005

Machine-extracted title · confidence 100%

Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.

NYC-WTC_000125076–000125097

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125083
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEP ACP Fax:7185953648 Feb 28 2005 17:06 P.08

EAST:•COAST:ffAZ MAT -R-MOV INC bestos Abatement Contractor . 494 E:41 Street, Paterson, NJ 07504 Phone:.(973)345.0022 Fax::(973)3454665

Fanfran c/ Exterior Elevation Roof Membrane 100 SF Variance FR & FR Machine R n. •FanfranW Exterior Elevation Perimeter Flashing 200 SF Variance FR & FR Machine Rm. FarLI Tank/ Exterior Elevation Pipe Tar 20 SF Variance FR Sc PR Machine Rm. Total 320 SF • Roof -1 12 Floor Terraces Roof Membrane 500 SF Variance FR Sc rR Roof -1 12 Floor Terraces Tar & Flashing Perimeter 280 SF Variance FR & Alf • Total 780 SF Roof -1 1l Floor Terraces Roof Membrane 480 SF Variance FR & R Roof -1 11 Floor Terraces Tar & Flashing 20 SF Variance FR Sc •:R Total S00 SF Roof -1 •10 Floor Terraces Roof Membrane 2560 SF . Variance FR & R Roof -1 be Floor Terraces Tar & Flashing Perimeter 240 SF Variance FR Sc R Total 2800 SF Sub Total (Roofing) 18074 SF

Abatement of (18,074 Sq. Ft) of Roofing/Flashing/Tar Material . We shall comply with attachment PR and R We are requesting a variance from the following subsections: Section 1-410: During abatement air sampling inside work area. Section 1-41(d): No post abatement clearance air monitoring. Section 1-81(1): No pre-cleaning of the work area(s). Section 1-81(m): Partial plasticization of the work area. Section I-82(a) & 1-83(a): Remote decontamination facilities. Section 1-91: No negative air. Section-1-102(b): Not to fully saturate ACRM with amended water. Section 1-112(d) Sc 1-112(e): No 1st and 2nd settling period and no 2nd and 3rd cleaning.

Work Procedures a. Posting of Signs "Danger Asbestos" warning signs, in English, Spanish, and the language spoken by the crew members, will be posted at all entrances to the working area. b. Installation of Remote Worker Decontamination U,iiL This will be installed on the roof as outlined on the variance request This remote unit will be installed using three chambers divided by two air locks consisting of shower and a clean room,•and wash room for wet washing of the bags. This unit will also be fully sheathed inside and outside using two (2) layers of six mil fire retardant polyurethane sheeting, and two six mil reinforced polyurethane on the floor of the decontamination unit The clean room will include shelves, and clean sealable plastic bags for storage of clean clothes; the decontamination unit shall contain shelves for storage of respirators, towels, respirators filters, and others personal protective equipment. The shower room shall contain liquid soap & shampoo, and disposable towels. Shower water shall be drained, collected and filtered through a water filtration system. Filtered water shall be discharged to a

2

NYC-WTC 000125083

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125083Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →