NYC DEP ACP Fax:7185953648 Feb 28 2005 17:06 P.08
EAST:•COAST:ffAZ MAT -R-MOV INC
bestos Abatement Contractor .
494 E:41 Street, Paterson, NJ 07504
Phone:.(973)345.0022
Fax::(973)3454665
Fanfran c/ Exterior Elevation Roof Membrane 100 SF Variance FR & FR
Machine R n.
•FanfranW Exterior Elevation Perimeter Flashing 200 SF Variance FR & FR
Machine Rm.
FarLI Tank/ Exterior Elevation Pipe Tar 20 SF Variance FR Sc PR
Machine Rm.
Total 320 SF
• Roof -1 12 Floor Terraces Roof Membrane 500 SF Variance FR Sc rR
Roof -1 12 Floor Terraces Tar & Flashing Perimeter 280 SF Variance FR &
Alf • Total 780 SF
Roof -1 1l Floor Terraces Roof Membrane 480 SF Variance FR & R
Roof -1 11 Floor Terraces Tar & Flashing 20 SF Variance FR Sc •:R
Total S00 SF
Roof -1 •10 Floor Terraces Roof Membrane 2560 SF . Variance FR & R
Roof -1 be Floor Terraces Tar & Flashing Perimeter 240 SF Variance FR Sc R
Total 2800 SF
Sub Total (Roofing) 18074 SF
Abatement of (18,074 Sq. Ft) of Roofing/Flashing/Tar Material .
We shall comply with attachment PR and R
We are requesting a variance from the following subsections:
Section 1-410: During abatement air sampling inside work area.
Section 1-41(d): No post abatement clearance air monitoring.
Section 1-81(1): No pre-cleaning of the work area(s).
Section 1-81(m): Partial plasticization of the work area.
Section I-82(a) & 1-83(a): Remote decontamination facilities.
Section 1-91: No negative air.
Section-1-102(b): Not to fully saturate ACRM with amended water.
Section 1-112(d) Sc 1-112(e): No 1st and 2nd settling period and no 2nd and 3rd cleaning.
Work Procedures
a. Posting of Signs
"Danger Asbestos" warning signs, in English, Spanish, and the language spoken by the crew members,
will be posted at all entrances to the working area.
b. Installation of Remote Worker Decontamination U,iiL
This will be installed on the roof as outlined on the variance request This remote unit will be installed
using three chambers divided by two air locks consisting of shower and a clean room,•and wash room for
wet washing of the bags. This unit will also be fully sheathed inside and outside using two (2) layers of
six mil fire retardant polyurethane sheeting, and two six mil reinforced polyurethane on the floor of the
decontamination unit The clean room will include shelves, and clean sealable plastic bags for storage of
clean clothes; the decontamination unit shall contain shelves for storage of respirators, towels, respirators
filters, and others personal protective equipment.
The shower room shall contain liquid soap & shampoo, and disposable towels. Shower water shall be
drained, collected and filtered through a water filtration system. Filtered water shall be discharged to a
2
NYC-WTC 000125083