NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
6 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.
NYC-WTC_000125698–000125753Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document V1/L1/4VVU VO. 10 r1A b4b 4(4 OLVI Laval uonsiruciion Corp. Ig 005/013 01/26/2005 08:21 17325653654 NOVA DEVELOPMENT (RP PAGE 06
EAST.C+OA PAZ MAT•REMOVAL,l' TC Asbeetoe Abatement Contractor 484 F..41 Straet, Paterson, NJ 07504 Phone;(978)845.0029 . Fax:(973)345.4683
Section 1.4101 During abatement air sampling inside work area. Section 1-41(d): • No post abatement cleeranco air monitoring. • Section 1.81(ni): Partial plasticization of the work area. Sect1agi*1-82(a) & 1-83(a): Remote deeontarrrinatlon faclllties, Section 1.41: No negatlbo air. Wo3'.k_&ao dotes a. The remi to warkcr/waste decontamination enclosure system. Constructed in accordance with Attachment R, shall be erected lit ground level, loading area. T1à unit shall, be maintained in the workplace fof the duration of the abatement, b. Protection below the work area Is required with plai[iu aheeting. Where space permits, the p1att[ic ahee[ing shall aover the ground as per attachment RC. C. The scaffolding eystern around building will be. Created, maintained, and operetad in accordance with tlrq applicable federal. state, city rules and regulations by General Contractor, d, All movable hems from ilia ground beneath the work area will be refnoate beforo asbestos abatement work start. e. 1estrict access to the ground beneath the work area shall be by erecting temporary Nmuing or asbestos warning barrier tape at a 25-foot perimeter from this building. Only authorized personnel performing the work shall entry the work areas. f• Each abatement team shall be equipped v,uh appropriate tools, . a portable supply of be •
amended water. and a HEPA vacuum. After the ACM is adequately watt ,it using band tools. with the ACM being directly bagged our shall stripped dropped into a poly and promptly bagged. Upon completion of removal, each surface shall be HEPA wiped to remove any loose vialble debris and coated with a vacututjtbd, and then transparent g. Upon completion of zhc stripping at a location and before moving to onospaulant. the Immediate work area shall bo rendered free of visible debris. Next, the next, the surfaces of the platform shaN be carefully cleaned plastic covering of the secured, at the next work area. and
I,. Prior t4 the oontpladon of aaob $Rift, tbe.single bag will be remote deeunttrrakm ion unit (wash room), where the bags Shall be brought: over to the disposable
wetted down and placed into 6 mil disposable bag. The second disposable will be secured with water resistant an
additional
duct tape, labeled and brought, down the container by waste container for storage until the completion of wont ' of hoist, %he into the to
waste
moans
a
put
I.
Upon
eompledon
of
each
work area
and
clearance, visual
all
editical
birders
will be
removed
and
disposed
as of
ACM
and
shall
w
foUi the
same
bag
out
coquenoa as
menrJongd
shove.
UT.
Work
Areal
Basement,
Oroand
Floor,
Roof
Bulkhe
eJ
•
NYC-WTC 000125706
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
6 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
9 shared non-person entities · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
12 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123541
Invoice from Asbestos Removal Corp dated August 6, 2002 for roof cleanup services at 29 Broadway.
8 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100474
Billing statement from a contractor detailing charges for environmental cleanup and facade work.
6 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123194
Invoice for roof asbestos abatement work completed at 198 Broadway covering nearly 25,000 square feet.
6 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000116315
Invoice from Asbestos Removal Corp to NYC DEP detailing costs for roof cleanup at 300 Albany Street.
3 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128146
Project notification form submitted to DEP regarding asbestos work schedules at 80 Gold Street.
7 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121883
Invoice from Fiber Control Inc. dated September 25, 2002, regarding work at the 116 Chambers Street site.
4 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112570
Invoice detailing costs for asphalt and gravel roof cleanup operations at 63 Wall Street in June 2002.
5 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115082
Permit application submitted by Benjamin Kurzban & Son Inc. to the DEP for roof work at 205 Pearl Street.
6 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125069
A single-page record labeled for 130 Cedar Street with a unique NYC-WTC identifier.
Filed in the same folder
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Filed in the same folder
NYC-WTC_000125073
General notes and requirements for demolition work at 130 Cedar Street including contractor qualifications.
Filed in the same folder
NYC-WTC_000125076
Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.
Filed in the same folder
NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Filed in the same folder