NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 22 pages

Asbestos permit application correspondence, 130 Cedar Street, Feb 2005

Machine-extracted title · confidence 100%

Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.

NYC-WTC_000125076–000125097

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125079
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document NYC D I AL N tax:/1db9b;fb4d Feb 2d 2005 17:05 P.04

FROM :EastCoastHazMat FAX NO. :9733454665 Feb. 25 2005 05:25PM P4

EAST COAST RAZ MAT REMOVAL, INC Asbestos Abatement Contractor 494 E. 41 Street. Paterson, NJ 07504 to Phone: (973) 345-0022 Fax: (973) 345-4665

2 S 200S

Section 1-81(m) Not to plasticize wall 9tufaces being abated. \ti.\~~ ME4[? NOR We shall comply with the following Special Couditiuxis

1) We shall comply with original proposal and amended proposal dated January 20.2005. 2) Worker and waste deeontsmnination twits shall be attached to each work area. 3) All porous material must be disposed as ACM waste. 4) Att uva air motutoring must be in compliance with Section 1-41 to 1-45 of the NYCDPP Asbestos Regulations for each floor. 5) Comply with all other city, state and federal regulations pertaining to asbestos.

Method of Abateatcr t: Modified Tent

Lo ons 2nd Floor 220 square feet/ 66 linear feet 3rd Y~luur 220 squae feet/ 50 linear root Pipe shaft (ground to 12 floor) 0/700 linear feet

We shall comply witli anaocbnnent TM, D and the ibllowing Special Conditions: 1) A minimum of 3 dw.ing air satm, lee acid 3p ahatemertt rlearattce air PAmp1Pc trust he taatrraa Sri compliance with section 1-41 of the NYCDEP Asbestos Regulations for eaeb modified tent. 2) A remote worker decontamination unit must be build on eacb floor in the vicinity of the modified tuet operation. 3) No ACM will be disturbed whett non-ACM pipes are removed in the sttaitto access the ACM pipes otherwise, it will be considered pit of the asbc:,tos project.

Methoel of Abxtomont. Full Cont&mmeat

atiot amounts 4 Fl.00c 1,220 square feet / SO linear feet Se' Floor 3,320 square feet / 115 linear teat 6`, Floor 2,920 square feet 1268 linear feet 7d' Floor 10,820 square feet / 223 linear feet 6d' Floor 4,720 square feet / 50 liucar fret 9a' Floor 8,220 equate feet / 50 l u t sr feat 1011 Floot 8,720 square feet / 50 linear feet 1 l.a' Ptoor S20 oquarc feet / $4 liewt (cut 12° Floor 2,520 square feet / 86 linear feet

Section 1-81(m) Partial plasticization of work area.

We shall contolywith attachment VA and the fullowtug Special Conditious:

U

NYC-WTC 000125079

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125079Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →