NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 22 pages

Asbestos permit application correspondence, 130 Cedar Street, Feb 2005

Machine-extracted title · confidence 100%

Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.

NYC-WTC_000125076–000125097

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125078
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

-, , NYC DEP ACP Fax:7185953648 Feb 28 2005 17:05 P.03

FAX NO. :9733434665 Feb. 25 20 05:24PM P3 FROM :EastCoastHazMat

EAST COAST HAZ MAT REMOVAL,INC Mbeswe Abatement Contractor 494 6.41 Street, Paterson, NJ 07604 Phone:(973)345-0022 Fax:(973)345-4665 7' ILbLjyEb 82 32005 2045 i Method ofAbatxtncnt: 1.exnoVal of ACRM using foam: R00, 40 oaa' ns Anp t Maim Roof 13,994 Square Feet st 4,080 Square Fect 14°i, l 1 $: 12 Floor Terraces

Section 1-41(c) Du ring abatement air sampling inside the work arca. Section 1-41(d) No poet abdteansnt Glearance air monitoring. Section 1-810) Na pre-cleaning of the work area(s) $oction 1-81(m) 1'a!tia1 plasticization of the work area(s) Section 1-82(a)&1.83(a) B.zmote detontalaiaatiom facilities Section 1-91 No negative air. Section 1-102(b) Not to fully saturate+ ACRM with amended water. Section 1-112(d) Na I' and 2A° settling period and no 2i4 and 3" dealing.

We shall comply with auachmcnt FR We shall comply with Attachment R

Special Conditions:

1) This is to afl'irtn and declare that the affected ACRM under this project is ncithct vertical nor sloped beyond normal root drainage specification and any flashing material ptcacut is less then 24 inches in heist. • 2) A remote worker decontamination unit shall be coxiatxucted on each floor for the terrace abatement. 3) Abatement the not take the time with inside abatement on retrace

can place at same on the

floor. same

the

removal

Caulking on scaffolding.

t'ayadc

ACM Abatelricut:

ox

Method

lintel c nikixig,

d an

-windows

facade

Building -

Entire ucations. exterior

L

Square

Feet

3,800

Amounts:

are&

sampling work

air

During Abatoment

inside

1-41(c)

Section

monitoring ctearatice

air abatement

post

No

1-41(d)

Section

of

the; area.

work

Partial plasticization

(m)

1-81

Section

Section 1-82(a)& 1-83(a) Remote decontamitiatioti facilities negative

No air.

1-91

Section

U. and

EC

attachments

with

comply We

shall

Coatainmaut

Full Method

of

AbarrantnL:

Amotmts

Locations

feet

linear

square 2457

4115 feet /

Basement

linear feet

5220 square /

feet

50

Ground

Pleat

(cat

linear

feet!

3500

500 square

Bu11thead

Roof

NYC-WTC 000125078

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125078Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →