Deo 07 01 OS:lap Rirtek Environmental Corp °: t 12)768-0759 rt p:9
1t
8.11 All contaminated materials be stored in a securely locked dumpster or storage
shall
area. The dumpster or storage area must be approved by the Environmental Consultant
prior to its use.
8.12 The container used for the storage of bagged contaminated waste shall be an enclosed
dumpster. The dumpster shall have a solid metal roof and a door with a
solid
metal
padlock. No unbagged contaminated waste shall be stored in time dumpsters. The
Contractor ensure that all bags and drums placed in the dumpster are undamaged.
shall
8.13 The Contractor shall provide a secured storage area for the storage of packaged
contaminated waste prior to the transport to the waste site. The storage area shall be
equipped with lockable doors
8.14 All waste shall be disposed of at an approved landfill as construction debris.
9.0 WORK AREA CLEARANCE
9.1 The abatement work area is cleared when the work area is visually clean and clearance
air testing for ACM indicates that airborne asbestos fiber concentrations are below 70
s/mm2.
9.2 In the event that release criteria is not met, all costs associated with re-testing and re-
cleaning shall be borne by the Contractor.
9.4 Clearance Air Monitoring and Analysis by TEM
a. Acceptance Criteria: Decontamination of the work meets the requirements of
site
this test when every work area sample indicates an airborne concentration of
fibers of less than 70 structures per
squared. If any sample is above
millimeter
this clearance level, then the decontamination is incomplete and the work area
shall be re-cleaned.
END
ATTACHMENTS TO THESE PROCEDURES WILL INCLUDE THE FLOOR PLANS
SHOWING THE AREAS AND EXTENT OF CLEANUP REQUIRED BASED ON BULK
SAMPLE TESTING PERFORMED ON EACH FLOOR.