Asbestos inspection log, 189 Broadway, Nov 2002

Machine-extracted title · confidence 90%

Inspection log recording roof and north facade cleanup activities at 189 Broadway with air sampling.

NYC-WTC_000123065

Folder label: “189 BROADWAY 1001072, 63/13

Page image
Scanned page image, NYC-WTC_000123065
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 189 BROADWAY Floor Zip Borough ROOF 4 FACADE 10048 Inspector Dennis Antzoulatos Contractor's Name Building Type COMMERCIAL ACTION. REMEDIATION INC. /FIBER CONTROL Address City 3010 BURNS AVENOIE.! WANTAGH State Zip Phone NY 11 1793 (516) 781-3000 Laboratory Name Warren & Panzer Engincers Inc. Address 228 East 45 Street City New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block Inspection Date: 11-26-02 Lot Squad # N/A Badge# A020 Basis of Inspection Photos Taken WTC Survey Xes(No) Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: 0600PM-1200 MID TUESDAY NOVEMBER 26 2002 THE CIEAN UP OF TRE ROOF ABEA BENEATH THE A/C UNITS AND THE REMAINiNG PORTION OF THE NORTU FACADE WAS CONDUCTED. THE CLEAN UP OF THE EAST FACADE A PORTIÓN OF THE NOPTH FACADE HAD BEEN PERFORMED YESTERDAN A PLASTC DYRE WAS CONSTRUCTED Tо CоLEOT WATER RUN OFFe PLASTIC SHEETINGA MAS ALSO INSTALLED BEHIND THE METAL ROLi DOWN GATE DF THE "STYLZ" CLOTHING STORE. A GAP ERISIS BETLEEN THE FACADE SIGN AND THE ROL DOUN GATE. AIR SAMPUNE FOR THIS PORTION OF THE CUEAN UD PIONECT UNS "PERFORMED BY JOUN BUPGESS (CERNEICATEE AM 98-1139B EXP O9/O3 ) OF WAPREN E PANZER ENGINEEESI AlR SAMPUNE EQQUIPMENT WAE SET UP ON THE STREET AND SiDEWMA JUST BEYOND THE PLASTE DYKE. AU FACADE SURFACES WERE THOROUGHLY HEPA-VACULNED AND THEN POLER WASHED WITH A LEW PRESSURE SPRAT AT THE CONCHISION OF CLEAN UP AGTIVITIES, I CONDUCTED A VISUA INSPECTION OF THE CIEANED FACADE SURFARES AND I OBSERVED NO VISIBLE WITC DEBRIS. THE CONTERCKOR WILL BE OUSITE FARLY IN THE MORNING TO REMOE THE PLASTE SHEETING INETALED BEHIND THE METAL Не рАа POU DESN GATE AND TO PERFORM ANY MINOR CLEANINi EP STORE FRONT WINPOLOS THAS MAY WAVE PESIDUAL DEBRIS FROM LATER SEEPAGEL WEDNESDA NOVEMBER 2T Z00Z THE PLAGTIE SHEETING INSTALED BEHIND THE METAL ROL DAUN GATE OF THE "STALZ" CLOTHING STORE IS REMOVED. MINOE RECIEANING OF THE INSIDE PORTION (BACK) OF THE GnATE Is PORFORMER THE CIEAN UF PROSECI AL THE PREMISE IS NOCO COMPLETE. Rl NYC-WTC_000123065

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123065Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

3 shared non-person entities · 1 shared topics · similarity 0.945

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →