NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 49/189 BROADWAY 1001072, 63/13
Document / 9 pages

Invoice from Fiber Control Inc., 189 Broadway, Dec 2002

Machine-extracted title · confidence 90%

Invoice from Fiber Control Inc. dated December 2002 for services performed at the 189 Broadway job site.

NYC-WTC_000123045–000123053

Folder label: “189 BROADWAY 1001072, 63/13

Page image
Scanned page image, NYC-WTC_000123050
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. Floor ROOF $ FACADE Zip 10048 Inspector Dennis Antzoulatos 189 BROADWAY Borough 1 Building Type COMMERCIAL Contractor's Name ACTION REMEDIAZION INC./FIBER CONTROL Address City 3010 BURNS AVENVIE/O WANTAGH State NY Zip Phone 4 1793 (516) 781-3000 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block Lot Squad # N/A Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: 11-26-02 • Badge # A020 Photos Taken Yes(No) Address City State Zip Phone Time of Inspection from: 0600PM-1200 MID TUESDAY NAVEMBER 26 2002 CIEAN UP OF THE ROOF ADEA BENEAT THE A/C UNITS AND THE REMAINING PORTION OF THE NORTH FACADE WAS CONDUCTED. THE GUEAN UP OF THE EAST FACADE AND A PORTION OF THE NORTH FACADE HAD BEEN PERFORMED YESTERINE A PLASTC DYKE WAS CONSTRUCTED Tо соLEст WiATERE RUN OFF. PLASTIC SHEETING WAS ALSO INSTALED BEHIND THE METAL POL DOWN GATE OF THE "STPLZ" CLOTHING STCRE. A GAP ERISIS BETWEEN THE FACADE SIGN AND THE ROL DOWN GATEI SAMPUNG FOR THIS PORTION OF THE CUEAN UR PROVECT WAS PERFORMEN 3Y JONN BURGESS (CERTIFICATE+E.... 3 EXP 09/03 ) OF WAFREN E PANZER ENGINEERS. ALR SAMPUNG EQUiPMENT LAS SET UP ON THE STREET AND SIDEWAR JUST BEYOND THE PLASTIO DYKE. AL FACADE SURFACES WERE THOROUGHLY HEPA-VACUUMED AND THEN POLER WASHED WITH A LOC PRESSURE SPRAY AT THE CONCUISION OF CUEAN UE ACTIVITIES, I CONDUCTED A VISUAL INSPECTION OF THE CIEANED FACADE SURFARES AND I OBSERNED NO VISIBLE LTC DEBRIS. THE CONTRROTOR WILL BE ENSITE FARLY IN THE MORNING TO PEMQE THE PLASTE SHEFTING INSTANED BHIND THE METAL POL DESAN GATE AND TO PERFORM ANY MINOR CUEANING SE STORE FPONT LUINPOLSS THAT MAY ViAVE PESIDUAL DEBRIS FROM WATER SEERAGEL WEDNESDAR NOVEMBER 21 2002 THE PIASSTIO SHEETNE INSTALED BEHIND THE METAL ROLL DOWN GATE OF THE "STYLE" CLOTHING STORE IS REMCIED. MINOR RECIEANNEN OF THEE INSIDE PORTION (BACH) OF THE GATE IS PORFORMER. THE CLEAN UP PROSECT AT TUE PREMISE IS NOCO COMPLETE. NYC-WTC_000123050

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123050Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →