NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/85 NASSAU STREET 1001212, 79/2
Document / 12 pages

License agreement for debris cleanup, 85 Nassau Street, 2002

Machine-extracted title · confidence 95%

Agreement between DEP and building owner authorizing city-funded removal of WTC debris from exterior areas.

NYC-WTC_000099413–000099424

Folder label: “85 NASSAU STREET 1001212, 79/2

Page image
Scanned page image, NYC-WTC_000099423
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document - • Asbestos Inspection Report Floor ROOF $ FACADE Premise No. 85 MASSAN STREET Zip Borough 10038 Inspector Dennis Antzoulatos Building Type CONMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block Lot Basis of Inspection WIC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection DaNoreo Squad# Badge # N/A A020 Photos Taken (Yes/ No Address City State Zip Phone Time of Inspection from: As NOTED FRIDAL OGTOBER 18 2002 (0800AM- 0800PM) THE CUEAN UP OF THE ROOF OF THE PREMISE WAS BEGUN. A PEMCTE DECONTAMINATION UNIT LUAS ERECTED ON THE THIRD RLODR OE THE ADUACENT PREMISE (83 NASSAL STPEET ), WORKERE ACCESS THE ROOF AREA DF BS NASSAU STREET THROUGH 83 NABSAU STREET. AlR SAMPUNG FOR THIS PORTION OF THE CLEAN UR LAS PERFORMED BY FESTY OSEMWEGIE (CERTIFICATE # AM 01-01030 EP a1l03) SATURDAY OCTOBER 19 2002 - SUNDAY OUTUBER 20 2002 (0800AM-0400PM) THE CUEAN UP OSE THE ROCF DF THE FREMISE CONTINUES. AlR SAMPUNG FOR THIS PORTION OF THE CUEAN UD IS PERFORMED EL FESTY OEEMUTGIE OF WADPEN { PANZER ENGINEFES _MONDAY OCTOBER ZI 2002 - TUESDAY OCTOBER 22 2002 THE CLEAN UP DE THE WESI CREARI FACADE OF THE PREMISE WAS CONDUCTED. AIR SAMPUNG FOR THESE CLEAN UP ACTIVITTES WAS PERFORMED 34 IDRIS IDOW ICERTIFICATE # AH 02-il201 EZP 05/03). WEDNESDAY OCTOBER 23 2002 RE-CUFANING DF THE FIRE ESCAPE ON THE WEST FACADE ONGCING. THE CUEAN UP DF THE SET BACK AREZ оск ны осот те вотт соа _BEGGAN. IHORSDAY OCTOBER 24 2002 VISUAL INSPECTION IS OUNDUCTED ON THE RODF, PEAR (WEST) FACADE FIRE ESCAPE AND SET BAGU AREA BENEATH THE FIRE ESCAPE. ALL CUANED SURFACES WERE FREE OF VISIBLE WTC DEBRIS. NYC-WTC_000099423

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000099423Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →