Permit application for subway entrance closure at 189 Broadway, Nov

Machine-extracted title · confidence 90%

Letter from an asbestos contractor requesting MTA approval to close a subway entrance for exterior building cleaning at 189 Broadway.

NYC-WTC_000123057–000123064

Folder label: “189 BROADWAY 1001072, 63/13

Page image
Scanned page image, NYC-WTC_000123061
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 189 BROADWAY Borough Floor Zip ROOF $FACADE 10048 Inspector Dennis Antzoulatos Building Type COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 • Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block ILot Basis of Inspection WIC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: 11-26-02 Squad # Badge # N/A A020 Photos Taken Yes.No Address City State Zip Phone Time of Inspection from: 0600PM-1200 MID TUESDAY NOVEMBER 26 2002 THE CUEAN UP OF THE ROOF AREA BENEATH THE A/C UNITS AND THE REMAINING PORTION OF THE NORTU FACADE WAS CONDUCTED. THE CUEAN UP OF THE EAST FACADE AND A PORTION OF THE NOPTH FACADE HAD BEEN PERFORMED YESTERIDAN A PLASTIC DYKE WAS CONSTRUCTET TO COLECT WATER FUN OFF. PLASTIC SHEETING WAS ALSO INSTAULET BEHIND THE METAL ROL DOWN GATE OF THE "STPLZ" CLOTHING STORE. A GAP FRISIS BETWEEN THE FACADE SIGN AND THE ROL DOUN GATE. AIR SAMPUNG FOR THIS POETION OF THE CIEAN UN PROSECT UNS PERFORMED II JOUN BURGESS (CERTIFICATE i.. PII _ EXP 09/03 ) OF WAFREN İ PANZER ENGINEERS. AlR SAMPUNE EQQUIPMENT WAS SET UP ON THE STREET AND SIDEWALK JUST BEYOND THE PLASTIC DYKE. ALL FACADE SURFACES WERE THOROUGHLY HEPA-VACUUMED AND THEN POLER WASHED WITH A LOWS PRESSURE SPRA AT THE CONCHISION OF CUEAN UP ARTINITIES. I CONDUCTED A VISUAL INSPECTION OF THE CIEANED FACADE SURFARES AND I OBSERVED NO VISIBLE LTC DEBRIS. THE CONTRACTOR WILL BE OUSITE FARLY IN THE MORNING TO PEMOUE THE PLASTE SHERTING INETALLED BEHIND THE METAL POL DOUN GArE AND TO PERFORM ANE MINDR CUEANING DE STORE FRONT WINDOLS THAT MAY WAVE PESIDUAL DEBRIS FROM WATER SEEPAGEI WEDNESDAR NOVEMBER 21 2002 THE PLASTIE SHEETING INSTALLED DELIND THE METAL ROL DOUN GATE OF THE "STHLZ" CLOTHING STORE IS REMOVED. MINOR RECIEANING DF THEE INSIDE PORTION (BACK) OF THE GATE IS PORFORMED. THE CUEAN UT PROSECT AT THE PREMISE 1S NOL COMPLETE. NYC-WTC_000123061

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123061Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →