Building inspection form, 196 Broadway, WTC environmental assessment

Machine-extracted title · confidence 78%

Checklist form documenting building characteristics, facade visual inspection results, and asbestos presence assessment at 196 Broadway for post-9/11 environmental evaluation.

NYC-WTC_000123160–000123161

Folder label: “196 BROADWAY 1001219, 79/16

Page image
Scanned page image, NYC-WTC_000123161
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report : Premise No. 196 BROADWAY Floor Zip Borough ROOF AND FACADES 10038 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 79 Inspection Date: AS NOTED Squad# Badge # N/A A020 Basis of Inspection Photos Taken WTC Survey Sample Number Yes/No N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: SUNDAY AUGUST II 2002 (8°Am - Bªm) «LEAN UP ACTIVITIES BEGIN ON THE ROOF OF THE PREMISE, A REMOTE DECONTAMINATION UNIT IS SET UP ONE LEVEL BELOL THE ROOF WORK AREA AIR MONITORING FOR THIS PORTION OF TE WORK IS PERFORMED BY DIPO ELFMO (CERTIFICATE AH OI-14694 EXP 03/03) OF WARREN & PANZER ENGINEERS. MONDAY AUGUST 12 2002 (82m- 8pm) CUEAN UP ACTIVITIES ARE COMPLETED ON THE ROOF OF THE PREMISE. I CONDUCT A VISUAL INSPEGTION OF THE CUEANED ROOF SURFACES AND OBSERUE NO VISIBLE CUTC DEBRIS. THE CICAN UP OF THE SET BACK AREA IS BEGUN TODAY. ALR MONITORING FOR THIS PORTIONI OF THE PROSECT IS PERFORMED BY FESTY OSEMWEGIE (CERTIFICATE # AM 01-01030 EXP 01/03) OF WARREN $ PANZER ENGINEERS. VESDAU AUGUST 13 2002 TO THURSDALS AUGUST IS 2002 (80m- 8 pu LEAN UP ACTIVITIES CONTINUE ON THE SET BACK AS PER THE APPROVE SCOPE OF WORK. FRIDAR AUGUST 16 2002 THE CUEAN UP OF THE SET BACK IS COMPUETED. I CONDUCT A VISUAL INSPECTION OF THE CLEANED SURFACES AND OBSERVE NO VISIBLE WTC DEBRIS. SUNDAY AUGUST 18. 2002 (50oM- 12°°NOON > THE CUAN UP PROJECT ON THE FACADE (BROADWAY) WAS CONDUCTED TODAY A PLASTIE DYKE WAS CONSTRUCTED TO COLECT PUN OFE CATER. A MOBILE DECON TRUCK WAS UTILIZED. AIR MONITORING FOR THIS PORTION OF THE COORK WAS CONDUCTED BY FESTY OSEMWEGIE OF WARREN $ PANZER. I CONDUCTET A VISUAL INSPECTION OF THE CUEANED FACADE SURFACES AND OBSERNED NO VISIBLE CUTC DEBRIS. THE CUEAN UP PROVECT IS NOW COMPUETE. el NYC-WTC_000123161

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000123161Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.