OCT-04-2002 FRI 04:38 PM FAX NO. P. 24/31
SEP-13-2002 15:3e NYCDEP BANH1 ASBtLEAD TRU 718 !!J5 3648 P.
euba~itte directly to the DEP
An ACP7 fomn signed by the coneiotor and drmonitoring firm X11 beDOL. T i size of the pnrect,
mpzeientative on alts. The DEP shell provide notification to the NYS suthoeiation
specified ores, shall be iracated an the ACP7 bun.. Buildwg owners rbsll provide writteta
to the D5P for the work activities.
DP will coordinate activities with building owners and other city arettcieL
The sites and specifc areas to be doa ed shall be detarmiecd and specified by the DI P.
Caution
The ccsa actor shell restrict access by the public to the work ever (s) during dean-up'!sotivitia.
connector, his
tape and warning sigru shall be used to identify work areas. Access shell be limited o the
atnployoes, and Fedvr 1. Sun or local oMoida.
collected
The contractor shall provide all neceuny equipment, to remove, bag, transom, and dispose
waste. The connector is respouible for supplying all necessary equipmad.
substitution of
The specific e1cen up procedures for building root are attached. The DPP shall eon rider receive
the specified nneWodologies only if the request is received in wining. Any s tub; Ms must
prior a oval by the DEP.
For large asbestos clean-up projseta, a partial decontamination systeoa (changing root and ;lower) shall
be required at an entry/exit from each work area_ A remote decontamination system daeU be acceptable
with DEP oo-site approval
Cofrsctor oualffiestlou
The conttactoar shall have on staff and aaiS led to the connect a sufAciect number a:'propvdy tamed and
certified workers. Sae above,
Pare 2
05/03/02
NYC-WTC 000113574
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000113574Source: NYC Law Department, mirrored locally