NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 51/100 CHURCH ST 1001409, 125/20
Document / 31 pages

Cover letter from Management Corp, 100 Church Street, Oct 2002

Machine-extracted title · confidence 95%

Letter dated October 4, 2002 from Management Corp enclosing executed asbestos permit applications for 100 Church Street.

NYC-WTC_000126787–000126817

Folder label: “100 CHURCH ST 1001409, 125/20

Page image
Scanned page image, NYC-WTC_000126810
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

An ACP7 foam dgned by the contractor and air-monitoring Arm shall be submitted direcdy to the DEP eve on site. The DEP shall provide notification to the NYS DOL. The size of the project, specified was, shall be indicated on the ACP7 form.. Building owners shall provide written authorization to the DEP for the work activities. DEP will coordinate activities with building owners and other city agencies. The sites and specific areas to be cleaned shall be determined and specified by the DEP. The contractor shall restrict access by the public to the work sees (a) during clean-up activities. Caution tape and waning signs shall be used to identify work areas. Access shall be limited to the contractor, his employees, and Federal, State or local ofRicials. The contractor shall provide all necessary equipment, to ranove, bag, transport, and dispose collected waste. The contractor is responsible for supplying all necessary equipment. The specific clean-up procedures for building mob arc attached. The DEP shall consider substitution of the specified methodologies only if the request is received in writing. Any substitutions must receive prim approval by the DEP. For large asbestos clean-up projects, a partial decontamination system (chance room and slower) shall be required at an entry/exit from each work area. A remote dccont.wiTa On system shall be acceptable with DEP on-site approval. +ggtraetor D tl The contractor shall have on staff and assigned to the contract a sufficient number of properly trained and certified workers. See above.

Page 05/03/02

NYC-WTC 000126810

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000126810Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →