NYC 9/11 Public Portal Document
OCT-04-2002 FRI 04:39 PM FAX NO. P. 25/31
SEP-13-2002 15:39 NYCDEP BAI*IM ASI'LEAD TRU 716 ;!-95 3646 P.09
goof
caateeaeated
Application: This paoed~as udb s wet methods and carcM hygiene psotoeol for olaan,ing Ia06
with abeme eau iniug maternal (ACM).
date1w1uiaoas. All abimoeat will be
1. The shirt: roof shall be considered the wart eras for Batty/scanvaunt
pe 4#mcd by NYSDOL licensed conusosors with NYC PEP ce I .d
areas shell be
For ooa-gavel or stone oovasd root with localized curlew of visible debrU4 the I sera-tip
speotfled ("ipsafisd aee'7 by DSP.
For paveVtaoss covered roof wttsea, *c entire root abaU be included in the spedik I'a* roof art a for clean-up.
to
The gravel/stos shall be ultl M a clam-up sagitj arse as the roof and w N r shall be oolleatid,
fiNnre& and discharged into the ±nin/zewet as applicable.
aoisiy the roof
T. A olwtginn area aonaise6og of rwo adjacentstep-off Pads located ao the roof ice; ci IIdY shall be a4jsoent to the
a wsce/ertit. Talc a nn shall consist of a dam pad and a change pad. The clew pa
building inw rior aootsa way (or at tbt poine of e m the roof far color "Acees). ' flue dtangt pad absU be
layers of 10.
s4jaam to the oonvsmutsd roof areas. Each pad (change pad and clean pad) shall eo'stet of two and
roil reinforced plastic on tbs reoVaoeaa w ey surface and shall be lap enough to fsailits~tt c>asglnS
recormoend. though the met e° Simon will
dreoatsminatian as described beiein. A min+ num of 4' 14' is
be specific to throof
3. Wotiron stall first step fhoea the building iatalar (or exalet at the point of entry to t1!e toot) du+eetly onto the
disposable cWaall, plaatie booties,
clear pad. On the clew pad, each worker shall be double Weed with books shall be wet
gloves, and bead cove inp. Rubber boots nay be used U' d of the plaatio booties.. The
work than wear a mm t{i ittamu of a halffan air•
wiped and REM vacuumed prior to laving the roof. Each
pusifyatg respiator equipped with IMFPA c Mdges.
4. All powustions at the roof wdtbin 10 feet of the specified roof era iaobtded in the clai r-up shall be cleaned by
wet melhodw lEPA vacuum aad sealed with 6m11 polyethylene ahaeliag<
S. Roof cleanup still begin at the o ctitm proceed path g ~' t at "t-
Water shall be the ps o cry eagi:seerung d ber a.
6. Roof surhoei shall be wetted and then wet cleaned udttg wet wiping teclmtqua ruth wanes, mops, rap,
brushes, etc. HIPA vacuuming may also be used as alternative to or in oeanbaratioa w: th wet cleaning.
7. TT>roughout the peadvte ail personnel entering or existing the roof shall obsavc the personal
deoen4trdaadoa praetioes, Attention shall be paid to limiting na~tn ewe ry wlW g o0 or dispabsrrce of
~tojv on the mof Thew paaoal deceateminabon procedures shall be strictly adhered to, in order to
minimize the potential for eptading wntamtiaaaon to the hitator of the buildings.
S. Solid nonporous objects, such as metal patio fianutwv, plant pouws, and plastic normal re cushions, shall be wet
wiped with damp rye. Wooden olyeem cacti as docking shall be HEMA vacuumed, wet wiped, and lightly
brushed with a bristle brush vaD' rug titnuhaneous misting and local HEM =he=!. Woven matitirials aball
either be disposed es ACM or bagged ad reproved o8-zioe far proper ksmdering in ;:icccrdestoe with 29 CFR
190I. 1001. Potted plants with victual eontat nirtaaion abouw be disposed es ACM waste unless the owner
rsqudts deeoa esminatioa. Patted plants will be repeatedly rinsed, and provisions I ll be made to catch the
runoff water (i.e. into ACM diapoaal begs or by using rigs and IEPA wet-vacuums;).
9. Af a' completion of tlsc above, the specified arse roof shall be ca ollilly n ashen
Page 3
05/03/02
NYC-WTC 000113575
OCR can misread numbers and units. Confirm readings against the page image before using them.