NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 35/80 MAIDEN LANE
Document / 2 pages

Asbestos inspection report, 80 Maiden Lane, Nov 2002

Machine-extracted title · confidence 95%

Asbestos inspection report for 80 Maiden Lane conducted on November 19, 2002.

NYC-WTC_000102376–000102377

Folder label: “80 MAIDEN LANE

Page image
Scanned page image, NYC-WTC_000102376
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT PAGE 1 OF 1 PREMISE ADDRESS 80 Maiden Lane 11/1N/ULDA72/15/02 FLOOR ZIP SORO CODE BLOCK LOT ravaee 10038 SQUAD 1 BADGE# A078 PHOTOS TAKEN Yes INSPECTOR R. ~RAA~MMOHAN BLDG.. TYPE A BASIS of INSPECTION TRU 1909MN02

1 T1 a% ICemoval Corp. SAMPLE NO:-----------------

t S 129 Street ColleiePomt SAMPL.ENO.-------------- SAMPLENO. 1f356 (Y)61-4100 `d RO PA zer Engineers P.C. § 1Mden Lane LLc mast 45 Street NeW''ork *?Pffaiden Lane New York WE 1017 (2T'§22-0077 10'38 386-7712 CONTACT PARSON Jack Constantine, Building Manager TIME OF INSPECTION FROM: 8 am -5 pm

INSPECTION DISCLOSED: Tuesday 11/19/02: Trio's rigging contractor setting-up scaffolding for Maiden Lane facade. Wednesday 11/20/02: Jan Wolkowicz & 4 handlers of Trio and Celestine Obika of Warren&Panzer arrived on site and erected the decon on 20th floor mechanical room. Facade cleaning began from 15th floor and down where debris observed downward pattern. Thursday 11/21/02: Second scaffolding was set-up for Maiden Lane facade cleaning and the same crew completed 15 floors at the end of the day. This completes the facade cleaning utilizing drop scaffolding. At the east side on pipe scaffolding set-up by the building's general contractor requires plank set-up on each floor. Trio is in negotiations with the G/C for re-arranging planks. Friday 11/29/02: Jan Wolkowicz&5 handlers of Trio and Celestine of Warren&Panzer on site cleaning the windows and ledges on pipe scaffolding on Cedar Street. Fifth and second floor windows and ledges were cleaned. Monday 12/02/02: Jan Wolkowicz & crew and Celestine Obika continue facade cleaning on cedar street pipe scaffolding by re-arranging the aluminum planks. Floors 13 and 12 were cleaned where debri pattern observed downwards. Tuesday 12/03/02: Jan Wolkowicz and crew with Celestine of W&P began re-arranged planks and cleaned floors 11 and 10 facade on Cedar Street. Wednesday 12/04/02: Jan Wolkowicz and crew with Idris Idowu, AH 02-11201 of W&P continued facade cleaning on Cedar Street on floors 9a' and 8a'. Thursday 12/05/02: Wolkowicz and crew with Idris Idowu of W&P continued facade cleaning on floors 7th&6f'. Friday 12/06/02: Crew continued facade cleaning on Maiden Lane east side from floors 15 down to 8th and at Cedar Street floors 4a', 2°d &P,. Monday 12/10/02: Wolkowicz and crew continued facade cleaning on Maiden Lane from 7th floor thru 1s` floor. On Cedar Street side the plotforms of the pipe scaffolding were cleaned. Tuesday 12/11/02: No work scheduled due snow accumulation on Cedar Street bridge. Wednesday 12/12/02: Wolkowicz and crew with Festy of W&P began cleaning the bridge on Cedar Street. Sunday 12/15/02: Ireneusz&5 handlers with Oghogho Erhaber of Warren&Panzer began washing the facade below scaffold bridge on Maiden Lane and was completed at rpm. Crew moved equipment to Cedar Street side and began washing the facade below the scaffold bridge and was completed at 4:30pm.

Project Completed.

NOV # INFRACTIONS RESULT CODE 5 NOV # SUPERVISORS ~Q L'T

BLDG. TYPE A >6 STORIES B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1 Violation Issued 2 = No Violation Issued 3 = No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

NYC-WTC 000102376

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102376Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →