NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/30 West Broadway
Document / 25 pages

Permit application Part IV, management plan Jan 2006

Machine-extracted title · confidence 90%

Part IV of a permit application dated January 10, 2006 detailing the remediation and management plan for 30 West Street.

NYC-WTC_000095834–000095858

Folder label: “30 West Broadway

Page image
Scanned page image, NYC-WTC_000095836
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part IV- Waste Sampling & Management Plan Fiterman Hall 30 West Broadway. New York, New York Airtek Project 05-0867 — January 10, 2006

1.0 General

1.1 Objective

The objective of the Waste Sampling and Management Plan (WSMP) is to characterize, manage, containerize, and legally transport and dispose of waste streams that will be generated as part of the Fiterman Hall Remediation & Deconstruction Project.

1.2. Background

Pei Cobb Freed & Partners, Architects, LLP (PCF-P) has engaged the Environmental Consultant, Airtek Environmental Corp. (Airtek) on behalf of the Dormitory Authority of the State of New York (DASNY) and the City University of New York (CUNY) to prepare the WSMP in support of the remediation and deconstruction of Fiterman Hall, located at 30 West Broadway, New York, NY (the Building). This plan is in response to a request by the WTC Regulators for a documented approach to the project, and is Part IV of the Regulatory Submittal Package for the Project.

The Building was severely impacted by fallout from the events of September 11, 2001. It is the Owner's intent to conduct remediation of WTC-related contamination and abatement of in-place asbestos so that conventional deconstruction activities can be completed.

1.3 Remediation Phase

The Remediation Phase of the project includes the removal of all interior surfaces and non-structural elements within the Building, and the cleaning and encapsulation of all remaining structural elements under containment. The cleanup and abatement will be conducted so that the building can be safely deconstructed to allow for redevelopment of the Site. The Remediation Phase of the project will occur under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris; (b) removal and disposal of installed non-structural porous and non-porous building materials, contents and components; (c) cleaning and salvage of certain installed non-porous building equipment and components; (d) removal of building materials containing asbestos which were present in the Building prior to September 11, 2001; (e) packaging of asbestos and other regulated waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury-containing thermostats, etc. at generation points; (f) movement of containers to the decontamination unit and movement of decontaminated containers to waste loading.

NYC-WTC 000095836

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095836Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →