NYC 9/11 Public Portal Document
Regulatory Submittal Part IV- Waste Sampling & Management Plan
Fiterman Nall 30 West Broadway, New York, New York
Airtek Project 05-0867 — January 10, 2006
1.4 Deconstruction Phase
The Deconstruction Phase of the project includes the structural
deconstruction of the Building, including the remaining cleaned and
encapsulated structural concrete and steel components, and the steel and
masonry facade.
2.0 Primary Material Categories
This WSMP has been developed to address the removal of all building contents
and components, including waste generated by the Remediation Phase (i.e.,
asbestos abatement, CoPC abatement, handling and packaging of building
contents and deconstruction waste) and the Deconstruction Phase (structural
components and masonry facade). Anticipated waste streams are listed below:
2.1 Regulated Contaminants
• WTC Dust - Contaminants of Potential Concern (CoPCs)
• CoPC-impacted Building Materials (ACM at a Minimum)
• Asbestos-containing Building Materials (ACBMs)
• Lead-painted Building Materials
2.2 PPE and Remediation Process Consumables
• Personal Protective Equipment (Suits/filters/gloves/booties)
• Abatement Materials (rags, bags, poly sheeting)
• HEPA Vacuum Bags/Negative Air Filters
• Miscellaneous Contaminated Disposables
2.3 Deconstruction Waste
• Wall and Ceiling Plaster
• Suspended ceiling tiles and support grid
• Carpeting and other permeable flooring
• Gypsum Wall Board (GWB) and associated partition framing
• Fiberglass and other misc. insulation
• Limited remaining interior furnishings
• Door Systems and Window Systems
• Mechanical Electrical Plumbing (MEP) components including, but
not limited to:
• HVAC System Components
• Plumbing System Components
• Electrical Wiring System Components.