Regulatory Submittal Part IV- Waste Sampling & Management Plan
Fiterman Hall 30 West Broadway. New York, New York
Airtek Project 05-0867 - January 10, 2006
Table of Contents
1.0 General 3
1.1 Objective
1.2 Background
1.3 Remediation Phase
1.4 Demolition Phase
2.0 Primary Material Categories 4
2.1 Contaminants
2.2 PPE and Remediation Process Consumables
2.3 Deconstruction Waste
2.4 Universal Waste
2.5 PCB Waste
2.6 Miscellaneous Materials
2.7 Non-Porous (Cleanable) Waste
2.8 Structure and Facade
3.0 Overall Waste Characterization Strategy 6
4.0 Sampling Frequencies 11
4.1 Contaminants
4.2 PPE and Remediation Process Consumables
4.3 Deconstruction Waste
4.4 Universal Waste
4.5 PCB Waste
4.6 Miscellaneous Materials
4.7 Non-Porous (Cleanable) Waste
4.8 Structure and Facade
5.0 Analytical Methodologies 8
5.1 Toxicity
5.2 Ignitability
5.3 Corrosivity
5.4 Reactivity
5.5 Total PCBs
6.0 Waste Packaging & Storage 15
6.1 Asbestos Waste
6.2 PPE and Process Consumables
6.3 Hazardous Waste
6.4 Universal Waste
6.5 PCB Waste
6.6 Miscellaneous Contents
7.0 Transportation Requirements 16
8.0 Travel Routes 17
9.0 Disposal Facilities 17
10.0 Documentation 17
Attachment A: Building Content Inventory/Chemical Log
Attachment B: Waste Routes
Attachment C: Waste Storage Areas
Attachment D: Quality Assurance Project Plan
NYC-WTC 000096520
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000096520Source: NYC Law Department, mirrored locally
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.