NYC 9/11 Public Portal Document
Part IV- Waste Management Plan
133-135 Greenwich Streetl21-23 Thames Street
Airtek Project 05-0701— Rev 1, September 16, 2005
6.0 Sampling Frequencies and Disposal
6.1 Contaminants
The limited ACBMs at the site have been identified and located. Limited
WTC Dust sampling has been conducted. Where further WTC dust can be
identified, further sampling will be conducted to support waste
classification prior to removals off-site. Detailed information on sampling
locations will be documented. A detailed sampling scheme cannot be
developed until further dust is encountered. Where possible, each floor of
each building will represented within any composite sample.
6.2 Deconstruction Waste
For each of the Deconstruction Waste Materials listed in section 2.2
above, a minimum of five confirmatory waste samples will be collected
from different locations and functional spaces in each building (a
minimum of five samples per building, with each floor of each building
represented. Each building's samples will be composited for analysis (one
analysis per material, per building). Where it is deemed appropriate by the
Environmental Consultant, more samples may be collected and analyzed.
Results will be available prior to the commencement of site removals.
6.3 Miscellaneous Materials
Due to the small scale, and simple use (commercial/residential) of the
buildings and their systems, additional miscellaneous regulated and/or
hazardous waste is anticipated to be very limited in nature and scope. The
Environmental Consultant will conduct daily inspections of the abatement
work area to identify suspect components for segregation and testing
and/or other determination. The Environmental Consultant will make
determinations as to the appropriate testing required to characterize any
materials encountered. Where possible, each floor of each building will
represented within any composite sample of miscellanoues waste, and the
minimum of five grab samples to composited will be observed.
In general, the following will apply:
6.3.1 Light Ballasts and other PCB Wastes:
During deconstruction activities, as ballasts are removed from lighting
fixtures, the Abatement Subcontractor shall clean the surfaces of dust and
containerize ballasts for disposal as PCB waste. All ballasts, including
those labeled "No PCB" will be containerized for disposal as PCB waste
due to the presence of potting material. For potentially PCB-containing
equipment other than ballasts, PCB samples may be required to determine
whether the dielectric fluid contains more than 50 parts per million (ppm)
NYC-WTC 000134325
OCR can misread numbers and units. Confirm readings against the page image before using them.