NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 55/No folder label
Document / 283 pages

EPA review letter, 133-135 Greenwich Street

Machine-extracted title · confidence 90%

US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134317
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part IV- Waste Management Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701— Rev 1, September 16, 2005

1.0 General

1.1 Objective

The objective of the Waste Management Plan (WMP) is to characterize, manage, containerize, and legally transport and dispose of waste streams that will be generated as part of the 133-135 Greenwich Street/21-23 Thames Street Deconstruction Project.

1.2. Background

The Copper Group, Inc. has engaged Airtek Environmental Corp. (Airtek) to prepare the following project plan in support of the de-construction of the buildings located at 133-135 Greenwich Street and 21-23 Thames Street, New York, NY. This plan is in response to a request by the WTC Regulators for a documented approach to the project.

Though they sustained little physical damage, the buildings at 133-135 Greenwich Street and 21-23 Thames Street were impacted in places by fallout from the events of September 11, 2001. It is the Owner's intent to conduct abatement of in- place asbestos, and to effect a decontamination of the interior of the building so that conventional demolition activities can be completed.

1.3 Abatement Phase

The Abatement Phase of the project includes the cleaning and removal of all interior surfaces and non-structural elements within the building under containment. The cleanup and abatement will be conducted so that the building can be safely deconstructed to allow for redevelopment of the Site. The abatement Phase of the project will occur under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris; (b) removal and disposal of installed porous and certain non-porous building materials and components; (c) cleaning and salvage of certain installed non-porous building equipment and components; (d) removal of building materials containing asbestos which were present in the Building prior to September 11th, 2001; (e) packaging of asbestos and other regulated waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury- containing thermostats, etc. at generation points; (f) movement of containers to the decontamination unit and movement of decontaminated containers to waste loading.

1.4 Conventional Demolition Phase

3

NYC-WTC 000134317

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134317Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →