NYC 9/11 Public Portal Document
September 25, 2001
Cushman and Wakefield Inc
Mr. Ronald fiontune
44 Wall Street
New York, NY 1.0005
RE: 44 Wall Street basement hallway
I?Degmor, Inc. will provide all labor, material,
fallowing project. Please note that all work willequipme7.t and insurance necessary to perform the
be completed in accordance to all local, city
state regulations. and
All ACM will be disposed of properly at an
EPA approved landfill. The wsste manifest will
submitted as soon as our office receives it. be
SCOPE OP WORK:
• Removal of approx 600SE of VAT (A.CPS
and AV120 procedure)
PRICE QUOTE: $9,60'0.00
GENERAL NOTES, CONDITIONS,
EXCEPTIONS AND EXCLUSIONS
All sales taxes are excluded because
C.C.I. exemptions may apply
+ AU 1quotations exclude: building
services, elevator use charges, opirating engineer charges,
firewatch/dowmtime standby/overtime, g
temporary electrical services
Al] quotations include $5 million aggregate ~'
asbestos liability insurance
All quotations are contingent upon:
verification of scope of work, agreement on work
procedures by all interested parties, ninety (90) days
Quoted price includes provision of Certified acceptance.
Waste Manifest upon completion of project.
Price includes federal and state asbestos
filings and fees. Price gives no
other types of filings or fees. consideration to any
+ Client must provide a source of water
and electricity and temporary
P ~' connections. Price gives
no consideration to ~y standby trades,
operating engineers, etc.
Price gives noconsideration to anyrepair,
• Client must remove all replacement, reirsulation, etc.
portable and movable items from the work
activities. area prior to abatement
+ Pace gives no consideration to the
total and complete removal of mastic,
be heavily encapsulated. Any remnants will
Client must shut down all live services
into the work area for.the duration of
project.
NYC-WTC 000094923
OCR can misread numbers and units. Confirm readings against the page image before using them.