DEP Hard Copies (68 Boxes) / DEP Box 44
NYC-WTC_000164695Machine-extracted title Chain of custodySummary Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
Inhalation/Absorption Smoke, chemical (PCB, lead, mercury, asbestos)
Strains and Sprains Over-reaching, over-exertion, manual lifting
Psychological Stress
DEP Hard Copies (68 Boxes) / DEP Box 44
NYC-WTC_000164697Machine-extracted title Chain of custodySummary Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
• When required by specific OSHA standards (e.g., asbestos, benzene, , lead,
formaldehyde, Carbon Monoxide)
• When worker exposure is reasonably anticipated to be
DEP Hard Copies (68 Boxes) / DEP Box 44
NYC-WTC_000164841 Lab reportAsbestos Benzene
Fibrous Glass PCBs
Refractory Ceramic Fibers Chromium
DEP Hard Copies (68 Boxes) / DEP Box 38
NYC-WTC_000107594Machine-extracted title Lab reportSummary Laboratory data table listing analytical results for various dioxin and dibenzofuran compounds with detection limits.
the professional opinion of ATC that all cleaning at 125 Cedar Street, New
York, New York was conducted in accordance with the project manual as well as all
applicable federal, state and local asbestos
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 2 OF 2
NYC-WTC_000155402Machine-extracted title Chain of custodySummary Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the
asbestos clearance air sampling procedures specified herein.
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 2 OF 2
NYC-WTC_000155425 Chain of custodyPost cleaning air samples for fibrous glass and silica shall be collected concurrently with the
asbestos clearance air sampling procedures specified herein.
DEP Hard Copies (68 Boxes) / DEP Box 40 / 20 VESEY STREET; 1001235, 88/5
NYC-WTC_000112122Machine-extracted title Permit applicationSummary NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
The watch shall be provided from the onset of asbestos removal until the
contractor has completed their scope of work and has removed all equipment/materials
from
DEP Hard Copies (68 Boxes) / DEP Box 35 / SCOPE OF WORK ADDENDUMS WORK SCHEDULE
NYC-WTC_000102612Machine-extracted title Chain of custodySummary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the
asbestos clearance air sampling procedures specified herein.
DEP Hard Copies (68 Boxes) / DEP Box 35 / SCOPE OF WORK ADDENDUMS WORK SCHEDULE
NYC-WTC_000102627Machine-extracted title Chain of custodySummary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the
asbestos clearance air sampling procedures specified herein.
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 2 OF 2
NYC-WTC_000155612 Chain of custodyPost cleaning air samples for fibrous glass and silica shall be collected concurrently with the
asbestos clearance air sampling procedures specified herein.
DEP Hard Copies (68 Boxes) / DEP Box 38 / 120 LIBERTY STREET; 1001040, 52/21
NYC-WTC_000108244Machine-extracted title UnclassifiedSummary Memo documenting site inspections at multiple WTC vicinity buildings on December 15, 2002, noting cleaning and sampling activities.
Except for Asbestos fibers. This they said had been done last week and results were good.
They said that three samples for lead were high in the cafeteria and room 207.
DEP Hard Copies (68 Boxes) / DEP Box 55
NYC-WTC_000134293Machine-extracted title Chain of custodySummary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
MONITORING
Each Subcontractor and trade employer shall perform personnel air sampling for the following
contaminants during Abatement Phase of the project: particulates as TSP, metals as TSP,
asbestos
DEP Hard Copies (68 Boxes) / DEP Box 55
NYC-WTC_000134320Machine-extracted title Chain of custodySummary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
and disposed of in compliance with this Waste Management Plan and applicable
regulations.
4.1 Contaminants
Full-building asbestos
DEP Hard Copies (68 Boxes) / DEP Box 55
NYC-WTC_000134393Machine-extracted title Chain of custodySummary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
MONITORING
Each Subcontractor and trade employer shall perform personnel air sampling for the following
contaminants during Abatement Phase of the project: particulates as TSP, metals as TSP,
asbestos
DEP Hard Copies (68 Boxes) / DEP Box 31 / BUILDINGS LISTS
NYC-WTC_000156374Machine-extracted title UnclassifiedSummary Field notes from September 2001 documenting inspections of buildings like 310 Church Street and 100 Church Street for debris.
Except for Asbestos fibers. This they said had been done last week and results were good.
They said that three samples for lead were high in the cafeteria and room 207.
DEP Hard Copies (68 Boxes) / DEP Box 42 / E-mails R. Avaltroni 2002
NYC-WTC_000161272Machine-extracted title Memo or letterSummary DEP reports EPA is awaiting Washington direction and notes recent scope changes including ceiling and wall cleaning.
Additionally, they believe that
all cleanups have to be treated as minor asbestos projects and thus DEP/DOL
regulations apply. This is not our view or EPA’s.
DEP Hard Copies (68 Boxes) / DEP Box 55
NYC-WTC_000134955Machine-extracted title Chain of custodySummary EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
0.2ug/m3 28 ug/m3
Zinc 16 ug/m3 160 ug/m3
Particles and Dusts
Asbestos
DEP Hard Copies (68 Boxes) / DEP Box 42 / WTC- Air Data
NYC-WTC_000161653Machine-extracted title FormSummary Agenda listing panelists from federal agencies, unions, and city departments for a March 2004 conference on post-9/11 air quality.
Asbestos is a hazardous substance under CERCLA.
“Neither CERCLA not the implementing regulations under the NCP
obligate EPA to undertake response actions.
DEP Hard Copies (68 Boxes) / DEP Box 42 / WTC- Air Data
NYC-WTC_000161655Machine-extracted title FormSummary Agenda listing panelists from federal agencies, unions, and city departments for a March 2004 conference on post-9/11 air quality.
Joel
Shufi-o and others are quoted in the previously cited article, “Asbestos Spectre Haunts
Manhattan” (9/11/2002), regarding EPA’s late entry into the situation;
DEP Hard Copies (68 Boxes) / DEP Box 08 / NO INFO
NYC-WTC_000145548Machine-extracted title Permit applicationSummary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
A steam pipe exploded, disbursing asbestos-contaminated mud
into nearby buildings.