Asbestos inspection log, 94 Fulton Street — page 1
Summary Inspection log documenting roof and setback cleanup activities with air sampling at 94 Fulton Street in October 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary Inspection log documenting roof and setback cleanup activities with air sampling at 94 Fulton Street in October 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No.
Summary Laboratory results of transmission electron microscopy testing for asbestos fibers on building materials at the specified location.
Phone: (212) 922.0077 Project: NYC-DEP W & P )File 4: 1079.01.02 118.120 Fulton Street Asbestos
Summary Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
change within the Building. 2.0 HEALTH AND SAFETY PROCEDURES This section identifies the principal hazards associated with the tasks to be performed during the cleaning, asbestos
Summary Invoice from Benjamin Kurzban & Son Control Inc. for roof decontamination work at 125 Fulton Street.
NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No.
Summary Invoice from Benjamin Kurzban & Son Control Inc. for roof decontamination work at 125 Fulton Street.
146:48 Aim S rect Performed Transmission Electron Microscopy (TENT) Asbestos
Summary Invoice from a contractor for completed environmental remediation work at 141 Fulton Street totaling $25,960.
NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No.
Summary Inspection log detailing roof and facade cleanup activities with air sampling at 141 Fulton Street in September 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 141 FULTON STREET Floor Zip Borough ROOF $ FACADE 10038 1 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son
Summary Laboratory results for asbestos fiber analysis via TEM microscopy at 114-116 Fulton Street dated July 2, 2002.
Project: NYCDIP W & P Fi1e *: x079.01,02 Sides, 114116 Pu1tO Street Microscopy (TEM) Performed Asbestos Fiber Analysis
Summary Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
The asbestos safety technician shall personally witness the smoke testing of each of these glove bags.
Summary Inspection log detailing roof and facade cleanup activities and air sampling at 90 Fulton Street in September 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No.
Summary Administrative cover sheet for a permit application submitted to the DEP regarding 92 Fulton Street in October 2002.
NYC 9/11 Public Portal Document A1RBORNR ASBESTOS ANALYSIS BY TRANSMISSION ELECTRON MICROSCOPY o - 69
Summary Administrative cover sheet for a permit application submitted to the DEP regarding 92 Fulton Street in October 2002.
NYC 9/11 Public Portal Document AIRBORNE ASBESTOS ANALYSIS BY TRANSMISSION
Summary Laboratory report detailing transmission electron microscopy results for airborne asbestos samples from 92 Fulton Street.
NYC 9/11 Public Portal Document AIRBORNE ASBESTOS ANALYSIS BY TRANSMISSION ELECTRON MICROSCOPY CLIENT: Warren & Panzer lhlginecrs
Summary Asbestos inspection report for the roof and facade of 90 Gold Street conducted on July 18, 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Page 1 of 1 Premise #
Summary Asbestos inspection report for the roof and facade of 90 Gold Street conducted on July 18, 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Page 1 of _l, Premise #
Summary Application for roof work at 143 Fulton Street submitted by Benjamin Kurzban & Son Control Inc.
NYC 9/11 Public Portal Document 40 0 AIRBORNE ASBESTOS ANALYSIS BY TRANSMISSION ELECTRON MICROSCOPY O CIAMT: Warren
Summary Asbestos inspection report for the roof and facade of 90 Gold Street conducted on July 18, 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Page 1 of 1 Premise #
Summary Application for roof work at 143 Fulton Street submitted by Benjamin Kurzban & Son Control Inc.
5— AIRBORNE ASBESTOS
Summary Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris from exterior surfaces.
NYC 9/11 Public Portal Document Application: This procedure utilizes wet methods and careful hygiene protocol for cleaning roofs contaminated with asbestos containing material (ACM). 1.
Summary Agreement between the City of New York and a landowner regarding WTC debris cleanup at 143 Fulton Street.
Portal Document Roof Clean-UD Application: This procedure utilizes wet methods and careful hygiene protocol for cleaning roofs contaminated with asbestos