NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/141 FULTON STREET
Document / 1 page

Asbestos inspection log, 141 Fulton Street

Machine-extracted title · confidence 95%

Inspection log detailing roof and facade cleanup activities with air sampling at 141 Fulton Street in September 2002.

NYC-WTC_000128021

Folder label: “141 FULTON STREET

Page image
Scanned page image, NYC-WTC_000128021
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 141 FULTON STREET Floor Zip Borough ROOF $ FACADE 10038 1 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block 89 Inspection Date: As NOTED Lot Squad # Badge # 2 N/A A020 Basis of Inspection Photos Taken WTC Survey Yes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: AS NOTED SUNDAY SEPTEMBER 29 2002 (0800AM -0600PM) THE CUEAN UP OF THE RODF OF THE PREMISE BEGAN. A REMOTE DECONTAMINATION UNIT WAS ERECTED ON THE RODE OF THE PREMISE. AIR SAMPUNG. FOR THE DAYS CUEAN UP ACTIVITIES WAS PERFORMED BY IDRIS IDOWY.. (CERTIFICATE # AM O2-11201 EXP 05/03). FOUR Ale SAMPLES WERE RUN ON THE CUEAN PORTION OF THE ROCF AND ONE AIR SAMPLE WAS RUN IN THE STAIRWEUL LEADING TO THE ROOF. MONDAY SEPTEMIBER 30 2002 (0800AM-0800PM) THE ROOF CUEAN UP IS COMPLETED, THE CUEAN UP OF THE NORTM(REAR) FACADE AND BALCONIES BEGAN TODAY. AIR SAMPUNG FOR THE DAYS CLEAN UP ACTIVITTES WAS PERFORMED BY YURI BEDIN (CERTIFICATE * AH 96-14947 EXP 02/03). TUESDAY DETOBER 1, 2002 10800AM-0600PM) THE CUEAN UP OF THE NURTH FACADE AND THE BALCONIES WAS COMPLETED. Ale SAMPUNG WAS PERFORMED BY YURI BEDIN OF WARREN & PANZER. AT THE COMPLETION OF THE CLEAN UP ACTIVITIES, I CONDUCTED A VISUAL INSPECTION OF THE CUEANED ROOF AND FACADE SURFACES AND OBSERUED NO VISIBLE WUTC DEBRIS. SATURDAY OCTOBER 5 2002 10600AM-1100AM) THE CUEAN UP OF THE SOUTH FACADE OF THE PREMISE WAS CONDUCTED TODAY. THE CUEAN UP OF THE SOUTH FACADE OF THE ADIAGENT PREMISE (143 FUUTON ST) OCCURRED SIMULTANEOUSLY. FOR THE PURPOSES OF AL SAMPUNG THE FACADES OF THESE TWO BUILDINGS WERE TREATED AS ONE WORK AREA. A BOOM TRUCK WAS UCED TO ACCESS THE FACARE SURFACES. ALR SAMPUNG FOR THIS PORMION OF THE CLEAN UP WAS PERFORMED By EDWIN ELLS ( CERTFICATE * AH 00-00613 EXP 10/02). NO VISIBIE LTC DEBRIS WAS OBSERUED AT THE CONCLUSION OF THE CUEAN UP ACTIVITIES. THE CLEAN UP PROJECT IS NOL COMPLETE. NYC-WTC_000128021

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128021Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · similarity 0.984

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →